Airworthiness Directive · Amendment 39-18038 · Fuselage
The Boeing Company Airplanes
This AD applies to The Boeing Company Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-300, 747-400, 747-400D, and 747SR series airplanes, certificated in any category, identified as Group 4 airplanes in Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010, except airplanes that have been converted to an all-cargo configuration. Also, the requirements of this AD are applicable when a converted airplane operating in an all-cargo configuration is converted back to a passenger or passenger/cargo configuration.
We are adopting a new airworthiness directive (AD) for certain The Boeing Company Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-300, 747-400, 747-400D, and 747SR series airplanes. This AD was prompted by a report of a cracked reveal made from a casting found within a group of airplanes that should have machined reveals made only from 6061 aluminum. This AD requires an inspection to determine the material of the number 3 main entry door (MED) corner reveal, repetitive inspections of certain reveals for cracking, and corrective action if necessary. This AD also requires repetitive inspections for cracking of 6061 machined aluminum one-piece corner reveals, and replacement with 6061 machined aluminum two-piece corner reveals if necessary, which terminates certain repetitive inspections. We are issuing this AD to detect and correct fatigue cracking of the lower forward corner reveal of the number 3 MEDs, which could lead to the door escape slide departing the airplane when the door is opened and the slide is deployed, and consequent injuries to passengers and crew using the door escape slide during an emergency evacuation.
For Group 4 airplanes identified in Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010, that have not been previously inspected or changed in accordance with Boeing Special Attention Service Bulletin 747-53-2460, Revision 1, dated February 13, 2007: Before the accumulation of 1,500 total flight cycles, or within 1,000 flight cycles after the effective date of this AD, whichever occurs later, do a material type inspection to determine if the lower forward corner reveal is made from 6061 machined aluminum plate or 356 aluminum casting, in accordance with Part 6 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010. Doing the inspection specified in this paragraph terminates the inspections required by paragraph (j) of AD 2008-18-07, Amendment 38-15664 (73 FR 56960, October 1, 2008), for that airplane only.
(1) If, during any inspection required by paragraph (g) of this AD, any corner reveal is found to be a casting: Before the accumulation of 7,000 total flight cycles; within 2,000 flight cycles after the effective date of this AD; or within 3,000 flight cycles after the most recent inspection of the number 3 MED corner reveal was done in accordance with Boeing Service Bulletin 747-53A2378, Revision 4, dated June 10, 2010; whichever occurs later; do a detailed inspection for cracking of the corner reveal, in accordance with Part 2 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010. Repeat the inspection for cracking thereafter at intervals not to exceed 3,000 flight cycles until a new two-piece reveal is installed in accordance with the requirements of paragraph (g)(1)(i) of this AD. If any cracking is found, do the actions specified in paragraph (g)(1)(i) or (g)(1)(ii) of this AD.
(i) Replace the cast reveal with a new 6061 machined aluminum two-piece corner reveal, before further flight, in accordance with Part 3 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010.
(ii) Repair all cracking, before further flight, in accordance with Part 4 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010.
(2) If, during any inspection required by paragraph (g) of this AD, a corner reveal is found that is not a casting: Before further flight, do a detailed inspection for a sharp edge, in accordance with Part 1 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010; and do a detailed inspection for cracking of the corner reveal, in accordance with Part 2 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010. Repeat the inspection for cracking thereafter at intervals not to exceed 6,000 flight cycles until the corner reveal is replaced with a 6061 machined aluminum two-piece corner reveal in accordance with the requirements of paragraph (j) of this AD.
(i) If any sharp edge is found during any inspection required by paragraph (g)(2) of this AD, before further flight, rework the corner reveal, in accordance with Part 1 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010.
(ii) If any cracking is found during any inspection required by paragraph (g)(2) of this AD, before further flight, replace the corner reveal with a 6061 machined aluminum two-piece corner reveal, in accordance with Part 3 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010.
For Group 4 airplanes identified in Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010, that have been inspected previously in accordance with Boeing Service Bulletin 747-53-2460, Revision 1, dated February 13, 2007, and on which the corner reveal has been replaced with a one-piece reveal: Within 10,000 flight cycles after the date the reveal was replaced with a one-piece corner reveal, do a detailed inspection for cracking of the corner reveal, in accordance with Part 2 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010. Repeat the inspection for cracking thereafter at intervals not to exceed 6,000 flight cycles until the corner reveal is replaced with a 6061 machined aluminum two-piece corner reveal, in accordance with the requirements of paragraph (j) of this AD. If any cracking is found during any inspection required by this paragraph, before further flight, replace the one-piece corner reveal with a 6061 machined aluminum two-piece corner reveal, in accordance with Part 3 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010.
For Group 4 airplanes identified in Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010, that have been inspected previously in accordance with the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 1, dated February 13, 2007; and on which the corner reveal either has not been replaced, or has been replaced with a two-piece reveal that was made by reworking an existing one-piece reveal: Before the accumulation of 7,000 total flight cycles; within 3,000 flight cycles after the most recent inspection or rework done in accordance with Boeing Special Attention Service Bulletin 747-53-2460, Revision 1, dated February 13, 2007; or within 1,000 flight cycles after the effective date of this AD; whichever occurs later; do a material type inspection to determine if the corner reveal is a casting, in accordance with the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010. Doing the inspection specified in this paragraph terminates the inspections required by paragraph (j) of AD 2008-18-07, Amendment 39-15664 (73 FR 56960, October 1, 2008), for these airplanes.
(1) If, during any inspection required by paragraph (i) of this AD, any corner reveal is found to be a casting: Before further flight, do a detailed inspection for cracking of the corner reveal. For one-piece reveals, inspect in accordance with Part 2 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010; for two-piece reveals, inspect using a method approved in accordance with the procedures specified in paragraph (n) of this AD. Repeat the inspection thereafter at intervals not to exceed 3,000 flight cycles until a new two-piece reveal is installed in accordance with the requirements of paragraph (i)(1)(i) of this AD. If any cracking is found, do the actions specified in paragraph (i)(1)(i) or (i)(1)(ii) of this AD.
(i) Replace the cast reveal with a new 6061 machined aluminum two-piece corner reveal, before further flight, in accordance with Part 3 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010.
(ii) Repair all cracking, before further flight, in accordance with Part 4 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010.
(2) If, during any inspection required by paragraph (i) of this AD, any one-piece corner reveal is found to be installed and is not a casting: Before the accumulation of 10,000 total flight cycles; or within 6,000 flight cycles after the most recent inspection done in accordance with Boeing Special Attention Service Bulletin 747-53-2460, Revision 1, dated February 13, 2007; whichever occurs later; do a detailed inspection of the corner reveal for cracking, in accordance with Part 2 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010. Repeat the inspection for cracking thereafter at intervals not to exceed 6,000 flight cycles until the corner reveal is replaced with a 6061 machined aluminum two-piece corner reveal. If any cracking is found during any inspection required by this paragraph, before further flight, replace the corner reveal with a 6061 machined aluminum two-piece corner reveal, in accordance with Part 3 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010.
Installation of a 6061 machined aluminum two-piece corner reveal in accordance with Part 3 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-53-2460, Revision 2, dated December 22, 2010, terminates the repetitive inspections required by paragraphs (g), (h), and (i) of this AD.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Aircraft