Airworthiness Directive · Amendment 39-18014 · Flight controls
the Boeing Company Airplanes
(1) This AD applies to all The Boeing Company Model 767-200, -300, -300F, and -400ER series airplanes, certificated in any category.
(2) Installation of Supplemental Type Certificate (STC) ST01920SE (http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgstc.nsf/0/59027f43b9a7486e86257b1d006591ee/$FILE/ST01920SE.pdf) does not affect the ability to accomplish the actions required by this AD. Therefore, for airplanes on which STC ST01920SE is installed, a ”change in product” alternative method of compliance (AMOC) approval request is not necessary to comply with the requirements of 14 CFR 39.17.
We are adopting a new airworthiness directive (AD) for all the Boeing Company Model 767 airplanes. This AD was prompted by a report of a rotary actuator for the trailing edge (TE) flap that had slipped relative to its mating reaction ring, which is attached to the flap support rib. This AD requires repetitive inspections for corrosion of the fixed ring gear and reaction ring splines of the rotary actuator assembly for each support position, and related investigative and corrective actions if necessary. We are issuing this AD to detect and correct flap rotary actuator gear disengagement from its mating reaction ring. This disengagement with flaps extended could cause an uncommanded roll due to flap blowback, overload, or flap departure from the airplane, which could compromise safe flight and landing of the airplane.
Except as provided by paragraph (h) of this AD, at the applicable time specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 767-27A0229, dated March 4, 2014: Do a detailed inspection for corrosion of the rotary actuator assembly fixed ring gear and reaction ring splines for each support position; and do all applicable related investigative and corrective actions if necessary; in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 767-27A0229, dated March 4, 2014. Do all applicable related investigative and corrective actions before further flight. Repeat the inspection of the rotary actuator assembly fixed ring gear and reaction ring splines for each support position thereafter at the applicable intervals specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 767-27A0229, dated March 4, 2014.
Where paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 767-27A0229, dated March 4, 2014, specifies a compliance time “after the original issue date of this service bulletin,” this AD requires compliance within the specified compliance time “after the effective date of this AD.”