Airworthiness Directive · Amendment 39-18011 · Fuselage
the Boeing Company Airplanes
(1) This AD applies to The Boeing Company Model 737-100, -200, -200C, -300, -400, and -500 series airplanes, certificated in any category, as identified in Boeing Alert Service Bulletin 737-53A1241, Revision 1, dated June 11, 2013.
(2) Installation of Supplemental Type Certificate (STC) ST01219SE (http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgstc.nsf/0/082838ee177dbf62862576a4005cdfc0/$FILE/ST01219SE.pdf) does not affect the ability to accomplish the actions required by this AD. Therefore, for airplanes on which STC ST01219SE is installed, a “change in product” alternative method of compliance (AMOC) approval request is not necessary to comply with the requirements of 14 CFR 39.17.
We are superseding Airworthiness Directive (AD) 2005-07-12, which applies to certain the Boeing Company Model 737-100, -200, -200C, -300, -400, and -500 series airplanes. AD 2005-07-12 required detailed and eddy current inspections to detect cracking of the frame web around the cutout for the doorstop intercostal strap at the aft side of the station (STA) 291.5 frame at stringer 16R, and corrective action if necessary. Since we issued AD 2005-07-12, we received reports of new findings of cracking at various locations of the STA 277 to STA 291.5 frames and intercostals, including webs, chords, clips, and shear ties, between stringers 7R and 17R. This new AD requires inspections for cracking at the forward galley door cutout, and corrective actions if necessary. This new AD also reduces a certain inspection threshold required by AD 2005-07-12. We are issuing this AD to detect and correct fatigue cracking of the aft frame and frame support structure of the forward galley door, which could result in a severed fuselage frame web, rapid decompression of the airplane, and possible loss of the forward galley door.
For airplanes identified as Group 1 in Boeing Alert Service Bulletin 737-53A1241, Revision 1, dated June 11, 2013: Within 120 days after the effective date of this AD, do inspections for cracking from STA 277 to STA 328, stringer 7R to 17R of the forward galley door cutout, using a method approved in accordance with the procedures specified in paragraph (m) of this AD. Do all applicable corrective actions before further flight using a method approved in accordance with the procedures specified in paragraph (m) of this AD.
(1) For airplanes identified as Group 2 and Group 3 in Boeing Alert Service Bulletin 737-53A1241, Revision 1, dated June 11, 2013: Except as provided by paragraph (k)(2) of this AD, at the applicable times specified in tables 1 and 2 in paragraph 1.E, “Compliance,” of Boeing Alert Service Bulletin 737-53A1241, Revision 1, dated June 11, 2013, do detailed and surface high frequency eddy current (HFEC) inspections, as applicable, for cracking in the forward galley door cutout, in accordance with Part 2 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1241, Revision 1, dated June 11, 2013. Repeat the detailed and surface HFEC inspections thereafter at the applicable intervals specified in tables 1 and 2 in paragraph 1.E, “Compliance,” of Boeing Alert Service Bulletin 737-53A1241, Revision 1, dated June 11, 2013. If any crack is found, before further flight, do all applicable corrective actions in accordance with Part 2 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1241, Revision 1, dated June 11, 2013, except as required by paragraph (k)(1) of this AD. Accomplishment of a repair specified in Steps 1.a., 2.a., 6.a., or 6.b. of Part 2, of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1241, Revision 1, dated June 11, 2013, as applicable, and except as required by paragraph (k)(1) of this AD, terminates the inspections required by this paragraph for the repaired area(s) only.
(2) Removal and replacement of a cracked part, in accordance with Part 2 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1241, Revision 1, dated June 11, 2013, does not terminate the repetitive inspections required by paragraph (h)(1) of this AD.
The inspections required by paragraph (h)(1) of this AD may be terminated at areas with repairs installed prior to the effective date of this AD, provided the repairs meet the conditions specified in note 11 or note 13 of paragraph 3.A., “General Information,” of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1241, Revision 1, dated June 11, 2013.
Accomplishment of the preventive modification on the STA 291.5 frame web, in accordance with Part 2 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1241, Revision 1, dated June 11, 2013, terminates the inspections required by paragraph (h)(1) of this AD for the area that is common to the preventive modification.
(1) Where Boeing Alert Service Bulletin 737-53A1241, Revision 1, dated June 11, 2013, specifies to contact Boeing for a corrective action: Before further flight, do the applicable action using a method approved in accordance with the procedures specified in paragraph (m) of this AD.
(2) Where paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 737-53A1241, Revision 1, dated June 11, 2013, specifies a compliance time “after the date on Revision 1 of this service bulletin,” this AD requires compliance within the specified compliance time after the effective date of this AD.
(3) The title to each page of figure 5 of Boeing Alert Service Bulletin 737-53A1241, Revision 1, dated June 11, 2013, is incorrect and refers to “Stringer 16R” when it should refer to “Stringer 14R.”