Airworthiness Directive · Amendment 39-17943 · Time limits/maintenance checks
Airbus Airplanes
Superseded. A later AD replaced this one: AD 2017-10-17. Comply with the one in force.
This AD applies to Airbus Model A330-201, -202, -203, -223, -243, -223F, -243F, -301, -302, -303, -321, -322, -323, -341, -342, and -343 airplanes, certificated in any category, all manufacturer serial numbers.
We are superseding Airworthiness Directives (AD) 2006-21-08, AD 2007-14-01, AD 2008-25-02, AD 2010-04-09, AD 2011-01-02, and AD 2012-16-05, for certain Airbus Model A330 and A340 series airplanes. AD 2006-21-08, AD 2007-14-01, AD 2008-25-02, AD 2010-04-09, AD 2011-01-02, and AD 2012-16-05 required revising the maintenance program or inspection program to incorporate certain maintenance requirements and airworthiness limitations for fuel tank systems. This new AD requires a new maintenance or inspection program revision. This AD was prompted by a determination that more restrictive maintenance requirements and airworthiness limitations are necessary. We are issuing this AD to prevent the potential of ignition sources inside fuel tanks, which, in combination with flammable fuel vapors, could result in fuel tank explosions and consequent loss of the airplane.
(1) Within 3 months after the effective date of this AD, revise the maintenance or inspection program, as applicable, by incorporating Airbus A330 Airworthiness Limitations Section (ALS) Part 5—Fuel Airworthiness Limitations, dated November 16, 2011.
(2) Comply with all applicable instructions and airworthiness limitations included in Airbus A330 ALS Part 5—Fuel Airworthiness Limitations, dated November 16, 2011. The initial compliance times for the actions specified in Airbus A330 ALS Part 5—Fuel Airworthiness Limitations, dated November 16, 2011, are at the later of the times specified in paragraphs (g)(2)(i) and (g)(2)(ii) of this AD, except as required by paragraphs (h) and (i) of this AD.
(i) Within the applicable compliance times specified in Airbus A330 ALS Part 5—Fuel Airworthiness Limitations, dated November 16, 2011.
(ii) Within 3 months after accomplishing the actions required by paragraph (g)(1) of this AD.
(1) For type design changes specified in “Sub-part 5-2 Changes to Type Design,” of Airbus A330 ALS Part 5—Fuel Airworthiness Limitations, dated November 16, 2011, the compliance times are defined as “Embodiment Limits,” except as defined in paragraph (h)(2) of this AD.
(2) Where Airbus A330 ALS Part 5—Fuel Airworthiness Limitations, dated November 16, 2011, specifies a compliance time based on a calendar date for modifying the control circuit for the fuel pump of the center fuel tank (installing ground fault interrupters to the center tank fuel pump control circuit), the compliance date is September 18, 2016 (48 months after the effective date of AD 2012-16-05, Amendment 39-17152 (77 FR 48425, August 14, 2012)).
After accomplishing the revision required by paragraph (g) of this AD, no alternative actions (e.g., inspections), intervals, or CDCCLs may be used; except as specified in paragraph (h) of this AD; or unless the actions, intervals, or CDCCLs are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (j)(1) of this AD.