Airworthiness Directive · Amendment 39-17456 · Landing gear
Airbus Airplanes
Superseded. A later AD replaced this one: AD 2017-14-01. Comply with the one in force.
This AD applies to all Airbus Model A330-201, -202, -203, -223, -223F, -243, -243F, -301, -302, -303, -321, -322, -323, -341, -342, and -343 airplanes; Model A340-211, -212, -213, -311, -312, -313 airplanes; and Model A340-541 and -642 airplanes; certificated in any category; all serial numbers.
We are superseding an existing airworthiness directive (AD) for all Airbus Model A330-200 and -300 series airplanes; and Model A340-200, -300, -500, and -600 series airplanes. That AD currently requires a one-time detailed inspection of both main landing gear (MLG) bogie beams in the region of the bogie stop pad for detection of deformation and damage, and corrective actions if necessary. This new AD adds Model A330-200 Freighter series airplanes to the applicability. For certain airplanes, this new AD also adds repetitive inspections for damage and corrosion of the sliding piston sub-assembly, with new related investigative and corrective actions. This AD was prompted by reports of corroded bogie stop pads, including some with cracking. We are issuing this AD to detect and correct deformation or damage under the bogie stop pad of both MLG bogie beams, which could result in a damaged bogie beam and consequent detachment of the beam from the airplane or collapse of the MLG and departure of the airplane from the runway.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
This paragraph restates the requirements of paragraph (f)(1) of AD 2010-02-10, Amendment 39-16181 (75 FR 4477, January 28, 2010), with revised service information. For Model A330-200 and -300 series airplanes, and Model A340-200, -300, -500, and -600 series airplanes, except as required by paragraph (i) of this AD: At the applicable compliance time specified in paragraph (g)(1), (g)(2), (g)(3), (g)(4), (g)(5), or (g)(6) of this AD, perform one-time detailed inspections of both MLG bogie beams in the region of the bogie stop pad for detection of deformation and damage, and apply the applicable corrective actions, in accordance with the Accomplishment Instructions of the applicable service bulletin specified in paragraph (g)(7) of this AD. Do all applicable corrective actions before further flight.
(1) Airplanes with 22 months or less and 2,500 flight cycles or less from the first flight with the original bogie beam as of March 4, 2010 (the effective date of AD 2010-02-10, Amendment 39-16181 (75 FR 4477, January 28, 2010)): Not earlier than 2,500 flight cycles or 22 months on the original bogie beam, whichever occurs first, but not later than 40 months from first flight.
(2) Airplanes with 22 months or less and 2,500 flight cycles or less from the installation date of a new bogie beam in service as of March 4, 2010 (the effective date of AD 2010-02-10, Amendment 39-16181 (75 FR 4477, January 28, 2010)): Not earlier than 2,500 flight cycles or 22 months from the installation date of the new bogie beam, whichever occurs first, but not later than 40 months from the installation date of a new bogie beam in service.
(3) Airplanes with 22 months or less and 2,500 flight cycles or less from the installation date of an overhauled bogie beam in service as of March 4, 2010 (the effective date of AD 2010-02-10, Amendment 39-16181 (75 FR 4477, January 28, 2010)): Not earlier than 2,500 flight cycles or 22 months from the installation date of the overhauled bogie beam in service, whichever occurs first, but not later than 40 months from the installation date of the overhauled bogie beam in service.
(4) Airplanes with more than 22 months or more than 2,500 flight cycles from the first flight with the original bogie beam, as of March 4, 2010 (the effective date of AD 2010-02-10, Amendment 39-16181 (75 FR 4477, January 28, 2010)): Within 18 months after March 4, 2010 (the effective date of AD 2010-02-10).
(5) Airplanes with more than 22 months or more than 2,500 flight cycles from the installation date of a new bogie beam in service, as of March 4, 2010 (the effective date of AD 2010-02-10, Amendment 39-16181 (75 FR 4477, January 28, 2010)): Within 18 months after March 4, 2010 (the effective date of AD 2010-02-10).
(6) Airplanes with more than 22 months or more than 2,500 flight cycles from the installation date of an overhauled bogie beam in service, as of March 4, 2010 (the effective date of AD 2010-02-10, Amendment 39-16181 (75 FR 4477, January 28, 2010)): Within 18 months after March 4, 2010 (the effective date of AD 2010-02-10).
(7) Use the applicable service information to accomplish the actions required by paragraph (g) of this AD.
(i) For Model A330-200 and -300 series airplanes: Airbus Mandatory Service Bulletin A330-32-3220, dated October 10, 2008; Revision 01, dated October 5, 2011; or Revision 02, dated December 13, 2012.
(ii) For Model A340-200 and -300 series airplanes: Airbus Mandatory Service Bulletin A340-32-4264, dated October 10, 2008.
(iii) For Model A340-500 and -600 series airplanes: Airbus Mandatory Service Bulletin A340-32-5087, dated October 10, 2008.
This paragraph restates the requirements of paragraph (f)(2) of AD 2010-02-10, Amendment 39-16181 (75 FR 4477, January 28, 2010). Report the results of the inspection required by paragraph (g) of this AD, including no findings, to Airbus, Customer Services Directorate, 1 Rond Point Maurice Bellonte, 31707 Blagnac Cedex France; Attn: SEDCC1 Technical Data and Documentation Services; fax (+33) 5 61 93 28 06; email sb.reporting@airbus.com; at the applicable time specified in paragraph (h)(1) or (h)(2) of this AD.
(1) If the inspection is done on or after March 4, 2010 (the effective date of AD 2010-02-10, Amendment 39-16181 (75 FR 4477, January 28, 2010)): Submit the report within 30 days after doing the inspection.
(2) If the inspection was done prior to March 4, 2010 (the effective date of AD 2010-02-10, Amendment 39-16181 (75 FR 4477, January 28, 2010)): Submit the report within 30 days after March 4, 2010 (the effective date of AD 2010-02-10).
For bogie beams on which the inspection required by paragraph (g) of this AD has not been accomplished as of the effective date of this AD: At the later of the times specified in paragraphs (i)(1) and (i)(2) of this AD, perform one-time detailed inspections of both MLG bogie beams in the region of the bogie stop pad for detection of deformation and damage, and apply the applicable corrective actions, in accordance with the Accomplishment Instructions of the applicable service information specified in paragraph (i)(3) of this AD. Do all applicable corrective actions before further flight.
(1) At the applicable time specified in paragraph (i)(1)(i) or (i)(1)(ii) of this AD.
(i) For bogie beams that have not been overhauled: Not earlier than 2,500 flight cycles or 22 months, whichever occurs first, on a bogie beam since its first flight on an airplane since new, but not later than 40 months since its first flight on an airplane since new.
(ii) For bogie beams that have been overhauled: Not earlier than 2,500 flight cycles or 22 months, whichever occurs first, on a bogie beam since its first flight on an airplane after its most recent overhaul, but not later than 40 months since its first flight on an airplane after its most recent overhaul.
(2) Within 90 days after the effective date of this AD.
(3) Use the applicable service information specified in paragraph (i)(3)(i), (i)(3)(ii), or (i)(3)(iii) of this AD, to accomplish the actions required by paragraph (i) of this AD.
(i) For Model A330-200 and -300 series airplanes: Airbus Mandatory Service Bulletin A330-32-3220, Revision 02, dated December 13, 2012.
(ii) For Model A340-200 and -300 series airplanes: Airbus Mandatory Service Bulletin A340-32-4264, dated October 10, 2008.
(iii) For Model A340-500 and -600 series airplanes: Airbus Mandatory Service Bulletin A340-32-5087, dated October 10, 2008.
Except for bogie beams that have been inspected as specified in Airbus Mandatory Service Bulletin A340-32-5087: At the later of the times specified in paragraphs (j)(1) and (j)(2) of this AD, do the detailed inspection of both MLG bogie beams in the bogie stop pad area for damage and corrosion, and all applicable related investigative and corrective actions, in accordance with the Accomplishment Instructions of Airbus Mandatory Service Bulletin A330-32-3248, Revision 01, dated December 13, 2012 (for Model A330-200, -200 Freighter, and -300 series airplanes); or Airbus Mandatory Service Bulletin A340-32-4286, dated October 5, 2011 (for Model A340-200 and -300 series airplanes); except as required by paragraph (k) of this AD. Do all applicable related investigative and corrective actions before further flight. Repeat the inspection thereafter at intervals not to exceed 2,500 flight cycles or 24 months, whichever is first.
(1) Within 2,500 flight cycles or 24 months, whichever occurs first, accumulated by a MLG bogie beam since its first flight after the most recent accomplishment of Airbus Mandatory Service Bulletin A330-32-3220 or A340-32-4264, as applicable.
(2) Within 3 months after the effective date of this AD.
If any cracking of the bogie beam is detected during any inspection or repair required by paragraph (j) of this AD, or any repair required by paragraph (j) of this AD is beyond the maximum repair allowance specified in the applicable service information required by paragraph (j) of this AD: Before further flight, repair using a method approved by either the Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA; or the European Aviation Safety Agency (EASA) (or its delegated agent).