Airworthiness Directive · Amendment 39-17364 · Electrical power
Bombardier, Inc. Airplanes
(1) This AD applies to Bombardier, Inc. Model DHC-8-102, -103, -106, -201, -202, -301, -311, and -315 airplanes, certificated in any category, serial numbers 002 through 672 inclusive.
(2) This AD requires revisions to certain operator maintenance documents to include new actions (e.g., inspections). Compliance with these inspections is required by 14 CFR 91.403(c). For airplanes that have been previously modified, altered, or repaired in the areas addressed by these actions, the operator may not be able to accomplish the actions described in the revisions. In this situation, to comply with 14 CFR 91.403(c), the operator must request approval for an alternative method of compliance according to paragraph (k)(1) of this AD. The request should include a description of changes to the required inspections that will ensure the continued operational safety of the airplane.
We are adopting a new airworthiness directive (AD) for certain Bombardier, Inc. Model DHC-8-102, -103, -106, -201, -202, -301, -311, and -315 airplanes. This AD was prompted by reports of the loss of the fixed frequency system, leading to the loss of power to the left and right buses and all systems serviced by these buses. This AD requires modification of the wiring and changes to existing airworthiness limitations. We are issuing this AD to prevent loss of the fixed frequency system, which could lead to loss of a number of the pilot's and co-pilot's flight instruments, in addition to other avionics systems.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
Within 6,000 flight hours or 36 months after the effective date of this AD, whichever occurs first: Incorporate the wiring modifications specified in, and in accordance with, the Accomplishment Instructions of Bombardier Service Bulletin 8-24-87, Revision B, dated April 3, 2012.
Within 30 days after the effective date of this AD: Revise the airplane maintenance program by incorporating Task 2420/13, Operational Check of Relays K4, K5, K6, and K7 (Post Modsum 8Q101917), in the applicable temporary revision specified in paragraph (h)(1), (h)(2), or (h)(3) of this AD. The initial compliance time for Task 2420/13 is within 18,000 flight hours after accomplishing the actions specified in paragraph (g) of this AD, or 30 days after the effective date of this AD, whichever occurs later.
(1) For Model DHC-8-102, -103, and -106 airplanes: de Havilland Dash 8 Series 100 Temporary Revision AWL-117, dated April 8, 2011, to Section AWL2—Systems Maintenance, of Part 2, Airworthiness Limitations, of the Bombardier Dash 8 Series 100 Maintenance Program Manual, PSM 1-8-7.
(2) For Model DHC-8-201 and -202 airplanes: de Havilland Dash 8 Series 200 Temporary Revision AWL 2-48, dated April 8, 2011, to Section AWL2—Systems Maintenance, of Part 2, Airworthiness Limitations, of the Bombardier Dash 8 Series 200 Maintenance Program Manual, PSM 1-82-7.
(3) For Model DHC-8-301, -311, and -315 airplanes: de Havilland Dash 8 Series 300 Temporary Revision AWL 3-118, dated April 8, 2011, to Section AWL2—Systems Maintenance, of Part 2, Airworthiness Limitations, of the Bombardier Dash 8 Series 300 Maintenance Program Manual, PSM 1-83-7.
After accomplishing the revision required by paragraph (h) of this AD, no alternative actions (e.g., inspections) or intervals may be used, unless the actions and intervals are approved as an AMOC in accordance with the procedures specified in paragraph (k)(1) of this AD.