Airworthiness Directive · Amendment 39-17299 · Nacelles/pylons
The Boeing Company Airplanes
This AD applies to The Boeing Company Model 757-200, -200PF, and -200CB series airplanes; certificated in any category; line numbers 1 through 1048 inclusive; powered by Rolls-Royce engines.
We are superseding an existing airworthiness directive (AD) for certain The Boeing Company Model 757-200, -200PF, and -200CB series airplanes powered by Rolls-Royce engines. That AD currently requires repetitive inspections of the shim installation between the drag brace fitting vertical flange and bulkhead, and repair if necessary; for certain airplanes, an inspection for cracking of the four critical fastener holes in the horizontal flange, and repair if necessary; and, for airplanes without conclusive records of previous inspections, performing the existing actions. This new AD reduces the repetitive inspection interval; adds repetitive detailed inspections for cracking of the bulkhead, and repair if necessary; allows an extension of the repetitive intervals for certain airplanes by also doing repetitive ultrasonic inspections for cracking of the bulkhead, and repair if necessary; and provides an option for a high frequency eddy current inspection for cracking of the critical fastener holes, and repair if necessary. This action also adds a terminating action for certain repetitive inspections. This AD was prompted by reports of loose fasteners and cracks at the joint common to the aft torque bulkhead and strut-to-diagonal brace fitting, and one report of such damage occurring less than 3,000 flight cycles after the last inspection. We are issuing this AD to detect and correct cracks, loose and broken bolts, and shim migration in the joint between the aft torque bulkhead and the strut-to-diagonal brace fitting, which could result in damage to the strut and consequent separation of the strut and engine from the airplane.
This paragraph restates the one-time inspection and repair required by paragraph (g) of AD 2008-05-10, Amendment 39-15404 (73 FR 11347, March 3, 2008), with optional inspection method and revised service information. For airplanes identified in paragraphs (g)(1) and (g)(2) of this AD: Within 90 days after August 24, 2007 (the effective date of AD 2007-16-13, Amendment 39-15152 (72 FR 44753, August 9, 2007)), do a high frequency eddy current (HFEC) inspection for cracking of the four critical fastener holes in the horizontal flange and, before further flight, do all applicable repairs, in accordance with Part IV of the Accomplishment Instructions of Boeing Alert Service Bulletin 757-54A0047, Revision 3, dated June 27, 2007; Boeing Alert Service Bulletin 757-54A0047, Revision 4, dated June 24, 2010; or Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011; except as required by paragraph (i)(3) of this AD. As of the effective date of this AD, only Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011, may be used to accomplish the actions required by this paragraph. Doing an ultrasonic inspection for cracking of the fasteners, in accordance with Part IV of the Accomplishment Instructions of Boeing Alert Service Bulletin 757-54A0047, Revision 4, dated June 24, 2010; or Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011; is an acceptable method of compliance with the HFEC inspection requirement of this paragraph.
(1) Airplanes on which findings on the horizontal or vertical fasteners or the shims led to a rejection of any fastener during the actions specified in Boeing Alert Service Bulletin 757-54A0047, dated November 13, 2003; or Boeing Service Bulletin 757-54A0047, Revision 1, dated March 24, 2005.
(2) Airplanes that had equivalent findings prior to the actions specified in Boeing Alert Service Bulletin 757-54A0047, dated November 13, 2003, except for findings on airplanes identified as Group 1, Configuration 2, in Boeing Alert Service Bulletin 757-54A0047, Revision 3, dated June 27, 2007, that were prior to the incorporation of Boeing Service Bulletin 757-54-0035.
This paragraph restates the repetitive inspections and repair required by paragraph (h) of AD 2008-05-10, Amendment 39-15404 (73 FR 11347, March 3, 2008), with reduced repetitive intervals and revised service information. At the applicable initial times specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 757-54A0047, Revision 3, dated June 27, 2007, except as required by paragraphs (i)(1) and (i)(2) of this AD: Do the inspections specified in paragraphs (h)(1), (h)(2), and (h)(3) of this AD, and, before further flight, do all the applicable related investigative actions and repairs, by doing all the actions specified in Parts I and II of the Accomplishment Instructions of Boeing Alert Service Bulletin 757-54A0047, Revision 3, dated June 27, 2007; or by doing all the actions specified in Part I, and in Step 2 of Part II, of the Accomplishment Instructions of Boeing Alert Service Bulletin 757-54A0047 Revision 4, dated June 24, 2010, or Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011, except as required by paragraph (i)(3) of this AD. As of the effective date of this AD, only Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011, may be used to accomplish the actions required by this paragraph. Repeat the inspections required by this paragraph at the times specified in paragraph (h)(4) of this AD.
(1) Do detailed inspections of the shim installations between the vertical flange and bulkhead to determine if there are signs of movement.
(2) Do detailed inspections of the four fasteners in the vertical flange to determine if there are signs of movement or if there are gaps under the head or collar.
(3) Do detailed inspections of the fasteners that hold the strut to the horizontal flange of the strut-to-diagonal brace fitting to determine if there are signs of movement or if there are gaps under the head or collar.
(4) Repeat the inspections required by paragraph (h) of this AD at the earlier of the times specified in paragraphs (h)(4)(i) and (h)(4)(ii) of this AD. Thereafter, repeat the inspections at intervals not to exceed the applicable intervals specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011.
(i) At intervals not to exceed the applicable intervals specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 757-54A0047, Revision 3, dated June 27, 2007.
(ii) At intervals not to exceed the applicable intervals specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011, or within 90 days after the effective date of this AD, whichever occurs later.
This paragraph restates the exceptions to alert service bulletin procedures specified in paragraphs (i), (j), and (k) of AD 2008-05-10, Amendment 39-15404 (73 FR 11347, March 3, 2008), with revised service information.
(1) Where Boeing Alert Service Bulletin 757-54A0047, Revision 3, dated June 27, 2007, specifies a compliance time relative to “the date on this service bulletin,” this AD requires compliance within the corresponding specified time relative to the effective date of AD 2007-16-13, Amendment 39-15152 (72 FR 44753, August 9, 2007).
(2) Where Boeing Alert Service Bulletin 757-54A0047, Revision 3, dated June 27, 2007, specifies a compliance time relative to the “date of issuance of airworthiness certificate,” this AD requires compliance within the corresponding time relative to the date of issuance of the original standard airworthiness certificate or the date of issuance of the original export certificate of airworthiness.
(3) If any crack is found during any inspection required by this AD, and Boeing Alert Service Bulletin 757-54A0047, Revision 3, dated June 27, 2007; Boeing Alert Service Bulletin 757-54A0047, Revision 4, dated June 24, 2010; or Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011; specifies to contact Boeing for appropriate action: Before further flight, repair the crack using a method approved in accordance with the procedures specified in paragraph (q) of this AD.
This paragraph restates the inspection and repair requirements for airplanes for which there are no conclusive inspection records, as required by paragraph (l) of AD 2008-05-10, Amendment 39-15404 (73 FR 11347, March 3, 2008), with revised service information. For airplanes for which there are no conclusive records showing no loose or missing fasteners during previous inspections done in accordance with the requirements of AD 2007-16-13, Amendment 39-15152 (72 FR 44753, August 9, 2007); or AD 2005-12-04, Amendment 39-14120 (70 FR 34313 June 14, 2005): Do the actions specified in paragraphs (j)(1) and (j)(2) of this AD, at the times specified in those paragraphs, as applicable.
(1) Within 90 days after March 18, 2008 (the effective date of AD 2008-05-10, Amendment 39-15404 (73 FR 11347, March 3, 2008)), do the actions specified in paragraph (g) of this AD, except as required by paragraph (i)(3) of this AD.
(2) At the applicable initial times specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 757-54A0047, Revision 3, dated June 27, 2007, do the actions specified in paragraph (h) of this AD, except as required by paragraphs (i)(2) and (k) of this AD. And, before further flight, do all applicable related investigative actions and repairs, by doing all the actions specified in Parts I and II of the Accomplishment Instructions of Boeing Alert Service Bulletin 757-54A0047, Revision 3, dated June 27, 2007; or in Part 1 and in Step 2 of Part II of the Accomplishment Instructions of Boeing Alert Service Bulletin 757-54A0047, Revision 4, dated June 24, 2010, or Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011; except as required by paragraph (i)(3) of this AD. As of the effective date of this AD, only Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011, may be used to accomplish the actions required by this paragraph. Repeat the actions specified in paragraph (h) of this AD at the times specified in paragraph (h)(4) of this AD.
This paragraph restates the exception to alert service bulletin procedures required by paragraph (m) of AD 2008-05-10, Amendment 39-15404 (73 FR 11347, March 3, 2008). Where Boeing Alert Service Bulletin 757-54A0047, Revision 3, dated June 27, 2007, specifies a compliance time relative to “the date on this service bulletin,” this AD requires compliance within the corresponding specified time relative to March 18, 2008 (the effective date of AD 2008-05-10).
This paragraph restates an acceptable method of compliance with certain requirements of AD 2004-12-07, Amendment 39-13666 (69 FR 33561 June 16, 2004), specified by paragraph (p) of AD 2008-05-10, Amendment 39-15404 (73 FR 11347, March 3, 2008). Accomplishing the actions specified in paragraphs (g) and (h) of this AD terminates the requirements specified in paragraphs (b) and (d) of AD 2004-12-07.
At the applicable initial compliance times specified in paragraph (n) of this AD: Do the applicable actions specified in paragraph (m)(1) or (m)(2) of this AD, in accordance with Step 3 of Part II of the Accomplishment Instructions of Boeing Alert Service Bulletin 757-54A0047, Revision 4, dated June 24, 2010; or Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011. If no cracking is found, repeat the inspections thereafter at intervals not to exceed the applicable intervals specified in paragraph 1.E., “Compliance,” of the Accomplishment Instructions of Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011. If any crack is found during any inspection required by this paragraph, before further flight, repair the crack using a method approved in accordance with the procedures specified in paragraph (q) of this AD.
(1) For Group 1, Configuration 1 airplanes identified in Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011: Do the actions specified in paragraph (m)(1)(i) or (m)(1)(ii) of this AD.
(i) Do a detailed inspection for cracking of the bulkhead in the area around the access door cutout and around the critical fasteners in the horizontal flange.
(ii) Do a detailed inspection for cracking of the bulkhead in the area around the access door cutout and around the critical fasteners in the horizontal flange, and do an ultrasonic inspection for cracking of the bulkhead around the fasteners in the horizontal flange. Doing the actions in this paragraph extends the repetitive intervals of the inspections required by paragraph (n) of this AD.
(2) For Group 1, Configuration 2 airplanes; and Group 2 airplanes; identified in Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011: Do a detailed inspection for cracking of the bulkhead in the area around the access door cutout and around the critical fasteners in the horizontal flange.
At the applicable times specified in paragraphs (n)(1) and (n)(2) of this AD, do the actions required by paragraph (m) of this AD.
(1) For Group 1, Configuration 1 airplanes identified in Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011: At the later of the times specified in paragraph (n)(1)(i) or (n)(1)(ii) of this AD.
(i) Within 1,800 flight cycles after accomplishing the most recent inspection required by paragraph (h) or (j) of this AD.
(ii) Within 90 days after the effective date of this AD.
(2) For Group 1, Configuration 2 airplanes; and Group 2 airplanes; identified in Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011: At the later of the times specified in paragraph (n)(2)(i) or (n)(2)(ii) of this AD.
(i) Within 3,000 flight cycles after accomplishing the most recent inspection required by paragraph (h) or (j) of this AD.
(ii) Within 90 days after the effective date of this AD.
For Group 1, Configuration 2 airplanes; and Group 2 airplanes; as identified in Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011: Within 9,000 flight cycles or 54 months after the effective date of this AD, whichever occurs first, replace the horizontal and vertical flange fasteners in the strut-to-diagonal brace fitting on the number 1 and number 2 struts with new fasteners, and do all related investigative and applicable corrective actions, in accordance with PART V of the Accomplishment Instructions of Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011, except where Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011, specifies to contact Boeing for repair instructions, before further flight, repair using a method approved in accordance with the procedures specified in paragraph (q) of this AD. Do all related investigative and corrective actions before further flight. Accomplishment of the actions required in paragraph (o) of this AD terminates the inspection requirements of paragraphs (g), (h), (j), and (m) of this AD for Group 1, Configuration 2 airplanes; and Group 2 airplanes; as identified in Boeing Alert Service Bulletin 757-54A0047, Revision 5, dated June 9, 2011.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Aircraft