Airworthiness Directive · Amendment 39-17239 · Fuselage
The Boeing Company Airplanes
This AD applies to all The Boeing Company Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400, 747-400D, 747-400F, 747SR, and 747SP series airplanes, certificated in any category.
We are adopting a new airworthiness directive (AD) for all The Boeing Company Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747- 200C, 747-200F, 747-300, 747-400, 747-400D, 747-400F, 747SR, and 747SP series airplanes. This AD was prompted by reports of cracks in the main entry door number 1 upper main sill outer chord, along the bend radius of the chord on several airplanes. This AD requires a general visual inspection to identify any existing structural repair manual (SRM) repairs of the upper main sill outer chord of the left and right side main entry door number 1, repetitive detailed inspections for cracks in the upper main sill of the door(s); and related investigative and corrective actions, if necessary. This AD also requires repetitive inspections for airplanes on which a certain repair is done, and corrective actions if necessary, and reduces certain compliance times. We are issuing this AD to detect and correct cracks in the main entry door number 1 upper main sill outer chord, along the bend radius of the chord, which could result in loss of structural integrity of the airplane.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
For Groups 1 through 4 airplanes, as identified in Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010: At the applicable time specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010, except as provided by paragraphs (p) and (q) of this AD, do a one-time general visual inspection to identify any existing structural repair manual (SRM) repairs of the upper main sill outer chord of the left and right main entry door 1, as applicable. Remove any existing SRM outer chord repair that is found, before further flight, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010. In addition, after doing the one-time general visual inspection to identify any existing SRM repairs of the upper main sill outer chord of the left and right main entry door 1, before further flight, do a detailed inspection for cracks of the main upper sill outer chord, web, and frame attachment angles (or clips) of the left and right main entry door 1, as applicable. Do all actions in accordance with Part 2 of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010. If no crack and no existing SRM outer chord repair is found during any inspection required by this paragraph, at the applicable time specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010, except as provided by paragraphs (p) and (q) of this AD, repeat thereafter the detailed inspection for cracks, at intervals specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010, until the outer chord repair specified in Part 3 of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010, is installed.
For Groups 5 through 7 airplanes, as identified in Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010: At the applicable time specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010, except as provided by paragraphs (p) and (q) of this AD, do a detailed inspection for cracks of the main upper sill outer chord, web, and frame attachment angles (or clips) of the left and right main entry door 1, as applicable, in accordance with Part 2 of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010. If no crack is found during any inspection required by this paragraph, at the applicable time specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010, except as provided by paragraphs (p) and (q) of this AD, repeat thereafter the detailed inspection for cracks, at intervals specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010, until the outer chord repair specified in Part 3 of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010, is installed.
For Groups 1 through 4 airplanes, as identified in Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010: If an existing SRM outer chord repair is found and removed during the inspection required by paragraph (g) of this AD, before further flight, install a new outer chord repair in accordance with Part 3 of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010.
If any outer chord crack or cracked frame attachment angles (or clips) are found during any inspection required by paragraph (g) or (h) of this AD, before further flight, repair, in accordance with Part 3 of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010.
If any upper main sill web crack is found during any inspection required by paragraph (g) or (h) of this AD, before further flight, repair the crack using a method approved in accordance with the procedures specified in paragraph (s) of this AD. For Boeing Model 747-400 series airplanes only, the repair may also be done in accordance with Figure 201, of Repair 1, “Main Entry Door Number 1 Upper Main Sill Web Crack Repair from STA 440 to STA 480,” of Subject 53-10-15, “Fuselage Door Surround Structure-Section 41,” of Chapter 53, “Fuselage,” of Boeing 747-400 Structural Repair Manual, Revision 83, dated June 20, 2012.
If any upper main sill web or frame attachment angles (or clips) have been repaired as specified in PART 3—REPAIR of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010, and the outer chord repair specified in PART 3—REPAIR of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010, has not been installed, at the applicable time specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010, except as provided by paragraphs (p) and (q) of this AD, do a detailed inspection for cracks as specified in paragraph (g) or (h) of this AD, as applicable, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010. Repeat the inspections in paragraph (g) or (h) of this AD, as applicable, thereafter at intervals specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010, until the outer chord repair specified in Part 3 of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010, is installed.
For airplanes having the outer chord repair installed as specified in PART 3—REPAIR of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010: At the applicable time specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010, except as provided by paragraphs (p) and (q) of this AD, do a detailed inspection for cracks of the left and right main entry door 1 upper sill, as applicable, with the outer chord repair installed, in accordance with PART 5—AFTER-REPAIR INSPECTION of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010. Repeat the inspection for cracks thereafter at the applicable intervals specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010.
Repair any crack found during any inspection required by paragraph (m) of this AD, before further flight, using a method approved in accordance with the procedures specified in paragraph (s) of this AD.
(1) Accomplishing the main entry door 1 cutout detailed inspection required by AD 2009-18-07, Amendment 39-16003 (74 FR 43629, August 27, 2009); or AD 2010-01-01, Amendment 39-16157 (75 FR 1533, January 12, 2010); as applicable; before the effective date of this AD is acceptable for compliance with the detailed inspection requirements of paragraphs (g), (h), (l), and (m) of this AD only. The one-time general visual inspection of paragraph (g) of this AD is still required. For the repaired area only, accomplishment of the applicable repair required by paragraphs (j) and (k) of this AD is acceptable for compliance with paragraph (l) of AD 2009-18-07, and paragraph (h) of AD 2010-01-01.
(2) For all applicable airplanes that have accumulated 22,000 total flight cycles or more as of October 1, 2009 (the effective date of AD 2009-18-07, Amendment 39-16003 (74 FR 43629, August 27, 2009)), AD 2009-18-07 requires accomplishing the main entry door 1 cutout detailed inspection in accordance with Boeing Alert Service Bulletin 747-53A2349, Revision 3, dated October 2, 2008 (which is incorporated by reference in AD 2009-18-07). For all applicable airplanes (except Model 747-400 series airplanes modified to the Model 747-400 large cargo freighter (LCF) configuration) that have accumulated 22,000 total flight cycles or more as of February 16, 2010 (the effective date of AD 2010-01-01, Amendment 39-16157 (75 FR 1533, January 12, 2010)), AD 2010-01-01 requires accomplishing the main entry door 1 cutout detailed inspection in accordance with Boeing Alert Service Bulletin 747-53A2500, Revision 1, dated September 25, 2008 (which is incorporated by reference in AD 2010-01-01). For Model 747-400 series airplanes modified to the Model 747-400 LCF configuration and having accumulated 15,000 total flight cycles or more as of February 16, 2010 (the effective date of AD 2010-01-01), AD 2010-01-01 requires accomplishing the inspections in accordance with Boeing Alert Service Bulletin 747-53A2500, Revision 1, dated September 25, 2008 (which is incorporated by reference in AD 2010-01-01).
Where paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010, specifies a compliance time “after the original issue date of this service bulletin,” or “after the date on Revision 1 of this service bulletin,” this AD requires compliance within the specified compliance time after the effective date of this AD.
Where paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2785, Revision 1, dated July 15, 2010, specifies a compliance time of “within” a specified “total flight-cycles,” this AD requires compliance “before the accumulation” of the specified total flight cycles.