Airworthiness Directive · Amendment 39-17230 · Wings
Bombardier, Inc. Airplanes
This AD applies to Bombardier, Inc. Model CL-600-2B19 (Regional Jet Series 100 & 440) airplanes; certificated in any category; serial numbers 7003 through 7990 inclusive, and 8000 through 8999 inclusive.
We are superseding an existing airworthiness directive (AD) for certain Bombardier, Inc. Model CL-600-2B19 (Regional Jet Series 100 & 440) airplanes. That AD currently requires a one-time inspection of the shafts of the main landing gear (MLG) side-brace fittings to detect corrosion, and the forward and aft bushings in the left-hand and right- hand MLG side-brace fittings to detect discrepancies. The existing AD also requires corrective and related actions if necessary. This new AD requires repetitive detailed inspections for corrosion and damage of the MLG side-brace fitting, and replacing the side-brace fitting shaft with the re-designed side-brace fitting shaft of the MLG if necessary. This AD also requires eventual replacement of certain side-brace fitting shafts with the re-designed part. Replacement with a re- designed side-brace fitting shaft of the MLG is terminating action for the repetitive inspections. This AD was prompted by reports of failure of the side-brace fitting shaft of the main landing gear (MLG) due to corrosion. We are issuing this AD to prevent fractures of the side- brace fitting shafts of the MLG, and possible collapse of the MLG.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
(1) At the applicable times specified in paragraphs (g)(1)(i), (g)(1)(ii), (g)(1)(iii), and (g)(1)(iv) of this AD, do a detailed inspection for corrosion and damage of each side-brace fitting shaft of the MLG, in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 601R-57-052, Revision A, dated October 28, 2011. Repeat the inspections at the applicable times specified in paragraphs (g)(1)(i), (g)(1)(ii), (g)(1)(iii), and (g)(1)(iv) of this AD.
(i) For airplanes that average greater than 900 flight hours per year and have side-brace shafts part number (P/N) 601R10237-1 installed in either the left- or right-hand MLG, or if the side-brace shaft part number cannot be identified without removal: Within 1,000 flight hours after the effective date of this AD, do the inspection. Repeat the inspections thereafter at intervals not to exceed 1,000 flight hours until the replacement specified in paragraph (g)(2) or (h) of this AD is done.
(ii) For airplanes that average 900 flight hours or less per year and have side-brace shafts P/N 601R10237-1 installed on either the left- or right-hand MLG, or if the side-brace shaft part number cannot be identified without removal: Within 18 months after the effective date of this AD, do the inspection. Repeat the inspections thereafter at intervals not to exceed 18 months until the replacement specified in paragraph (g)(2) or (h) of this AD is done.
(iii) For airplanes that average greater than 900 flight hours per year and have side-brace shafts P/N 601R10237-3 installed on either the left- or right-hand MLG: Within 36 months after the effective date of this AD, do the inspection. Repeat the inspections thereafter at intervals not to exceed 36 months until the replacement specified in paragraph (g)(2) or (h) of this AD is done.
(iv) For airplanes that average 900 flight hours or less per year and have side-brace shafts P/N 601R10237-3 installed on either the left- or right-hand MLG: Within 60 months after the effective date of this AD, do the inspection. Repeat the inspections thereafter at intervals not to exceed 60 months until the replacement specified in paragraph (g)(2) or (h) of this AD is done.
(2) If any corrosion or damage is found during any inspection required by paragraph (g) of this AD: Before further flight, replace the side-brace fitting shaft with a new shaft P/N 601R10247-3, in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 601R-57-052, Revision A, dated October 28, 2011. Doing this replacement terminates the inspection requirements of paragraph (g) of this AD.
Do the replacement at the applicable time specified in paragraph (h)(1) or (h)(2) of this AD.
(1) For any airplanes that have side-brace shafts P/N 601R10237-1 installed, or if the side-brace shaft part number cannot be identified without removal: Within 27 months after the effective date of this AD, replace the side-brace fitting shaft of the MLG with a new shaft having P/N 601R10247-3, in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 601R-57-052, Revision A, dated October 28, 2011. Doing this replacement terminates the inspection requirements of paragraph (g) of this AD.
(2) For airplanes that have side-brace shafts P/N 601R10237-3 installed: Within 117 months after the effective date of this AD, replace the side-brace fitting shaft of the MLG with a new shaft P/N 601R10247-3, in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 601R-57-052, Revision A, dated October 28, 2011. Doing this replacement terminates the inspection requirements of paragraph (g) of this AD.