Airworthiness Directive · Amendment 39-17185 · Bell Helicopter Textron Canada Helicopters
Bell Helicopter Textron Canada Helicopters
This AD applies to BHTC Model 407 helicopters, serial numbers 53000 through 53990, certificated in any category.
We are adopting a new airworthiness directive (AD) for the Bell Helicopter Textron Canada Limited (BHTC) Model 407 helicopters. This AD requires you to replace tailboom-attachment hardware (attachment hardware), and perform initial and recurring determinations of the torque on the nuts of the tailboom-attachment bolts (bolts) at all four attachment locations. This AD was prompted by a review of the tailboom-attachment installation, which revealed that the torque value of the bolts specified in the BHTC Model 407 Maintenance Manual and applied during manufacturing was incorrect and exceeded the torque range recommended for the bolts. The actions required by this AD are intended to prevent an over-torque of a bolt, bolt failure, loss of the tailboom, and subsequent loss of control of the helicopter.
You are responsible for performing each action required by this AD within the specified compliance time unless accomplished previously.
(1) For helicopters with 7000 hours or less time-in-service (TIS), at the next 600 hours scheduled inspection, or 90 days, whichever comes first; and for helicopters with more than 7000 hours TIS, within 150 hours TIS or 90 days, whichever comes first, replace the tailboom-attachment hardware (attachment hardware) as follows:
(i) Remove the left upper bolt, washers, and nut.
(ii) Install a new bolt, part number (P/N) NAS627-30; washer, P/N 140-007-29S25E6; washer(s), P/N NAS1149G0732P; and new nut, P/N 42FLW-720 in accordance with paragraphs 2.a) through paragraph 3.e) of the “Accomplishment Instructions: Replacement of tailboom attachment bolts and nuts” section and Figure 2 in the BHTC Alert Service Bulletin No. 407-10-93, Revision A, dated August 30, 2010 (ASB).
(iii) Remove the opposite right upper bolt, washers, and nut, and accomplish the requirements in paragraph (e)(1)(ii) of this AD.
(iv) Remove the left lower bolt, washers, and nut.
(v) Install a new bolt, (P/N) NAS626-26; washer, P/N 140-007-25S22E6; washer(s), P/N NAS1149G0663P; and new nut, P/N 42FLW-624 in accordance with paragraphs 6.a) through 7.e) of the “Accomplishment Instructions: Replacement of tailboom attachment bolts and nuts” section and Figure 2 in the ASB.
(vi) Remove the right lower bolt, washers, and nut, and accomplish the requirements in paragraph (e)(1)(v) of this AD.
(2) After installation of the new attachment hardware, at intervals of not less than 1 hour TIS but not exceeding 5 hours TIS, determine the torque of each nut until the torque stabilizes at each attachment location, referring to Figure 2 of the ASB. Apply the minimum specified torque of the range, plus the minimum acceptable tare torque of 14 inch/lbs (1.58 Nm) for the upper nuts, and 9.5 inch/lbs (1.07 Nm) for the lower nuts.
(3) At intervals not to exceed 300 hours TIS, determine the torque of each of the four attachment nuts, referring to Figure 2 of the ASB. Apply the minimum specified torque of the range plus the minimum acceptable tare torque of 14 inch/lbs (1.58 Nm) for the upper nuts, and 9.5 inch/lbs (1.07 Nm) for the lower nuts. If the proper torque has not been retained since the last torque determination, remove and inspect the tailboom assembly for damage, corrosion, improper assembly, and condition. If the tailboom assembly is airworthy, replace the attachment hardware in accordance with the requirements in paragraphs (e)(1)(i) through (e)(1)(vi) and determine that the torque has stabilized in accordance with paragraph (e)(2) of this AD. Replace any unairworthy tailboom assembly with an airworthy tailboom assembly.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.