Airworthiness Directive · Amendment 39-17155 · Air conditioning
BAE Systems (Operations) Limited Airplanes
Superseded. A later AD replaced this one: AD 2017-04-04. Comply with the one in force.
This AD applies to BAE SYSTEMS (OPERATIONS) LIMITED Model BAe 146-100A, -200A, and -300A airplanes, and Model Avro 146-RJ70A, 146-RJ85A, and 146-RJ100A airplanes, certificated in any category; all models, and all serial numbers except airplanes that have incorporated auto-pressurization modification HCM50259A during production.
We are adopting a new airworthiness directive (AD) for certain BAE SYSTEMS (OPERATIONS) LIMITED Model BAe 146 and Avro 146-RJ series airplanes. This AD was prompted by reports of cracking and surface anomalies of the fuselage skin at the water trap/air dryer unit of the forward discharge valve due to corrosion. This AD requires repetitive detailed inspections for bulging, surface anomalies, and cracking of the fuselage skin adjacent to the discharge valves, repair if necessary, and application of additional sealant in the affected area if necessary. We are issuing this AD to detect and correct bulging, surface anomalies, and cracking that could propagate towards the forward discharge valve outlet, which could result in the failure of the fuselage skin, leading to a possible sudden loss of cabin pressure.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
Within 12 months after the effective date of this AD, do a detailed inspection to check for bulging, surface anomalies, and cracking of the fuselage skin adjacent to the discharge valve outlets (one frame fore and aft, one stringer above and below), in accordance with the Accomplishment Instructions of BAE SYSTEMS (OPERATIONS) LIMITED Inspection Service Bulletin ISB.21-162, Revision 1, dated September 16, 2010. Repeat the inspection thereafter at intervals not to exceed 24 months.
(1) If any bulging, surface anomalies, or cracking of the fuselage skin is found to be within the criteria defined in Subject 53-00-00, “Fuselage, General—Description,” of Chapter 53, “Fuselage,” of the BAE SYSTEMS BAe 146 Series/AVRO 146-RJ Series Structural Repair Manual for Series 100-200, Revision 66, dated October 15, 2011 (for Model 146-100A and -200A, and Avro 146-RJ70A and 146-RJ85A airplanes); or Subject 53-00-00, “Fuselage, General—Description,” of Chapter 53, “Fuselage,” of the BAE SYSTEMS BAe 146 Series/AVRO 146-RJ Series Structural Repair Manual for Series 300, Revision 44, dated October 15, 2011 (for Model 146-300A and Avro 146-RJ100A airplanes): Before further flight, repair the damage, in accordance with the Accomplishment Instructions of BAE SYSTEMS (OPERATIONS) LIMITED Inspection Service Bulletin ISB.21-162, Revision 1, dated September 16, 2010.
(2) If any bulging, surface anomalies, or cracking of the fuselage skin is found exceeding the criteria defined in Subject 53-00-00, “Fuselage, General—Description,” of Chapter 53, “Fuselage,” of the BAE SYSTEMS BAe 146 Series/AVRO 146-RJ Series Structural Repair Manual for Series 100-200, Revision 66, dated October 15, 2011 (for Model 146-100A and -200A, and Avro 146-RJ70A and 146-RJ85A airplanes); or Subject 53-00-00, “Fuselage, General—Description,” of Chapter 53, “Fuselage,” of the BAE SYSTEMS BAe 146 Series/AVRO 146-RJ Series Structural Repair Manual for Series 300, Revision 44, dated October 15, 2011 (for Model 146-300A and Avro 146-RJ100A airplanes): Before further flight, repair the damage according to a method approved by the Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA, or European Aviation Safety Agency (EASA) or its delegated agent.
Within 24 months after the effective date of this AD, unless a repair has already been accomplished in accordance with paragraph (g) of this AD: Apply additional PR1422A-2 or PR1764B-2 edge sealant between the water trap/air dryer and the fuselage skin, in accordance with the Accomplishment Instructions of BAE SYSTEMS (OPERATIONS) LIMITED Inspection Service Bulletin ISB.21-162, Revision 1, dated September 16, 2010. Application of additional sealant does not constitute terminating action for the repetitive detailed inspections required by paragraph (g) of this AD. Accomplishment of a repair as required by paragraph (g) of this AD terminates the repetitive inspection requirements of this AD.