Airworthiness Directive · Amendment 39-17142 · Fuselage
The Boeing Company Airplanes
Superseded. A later AD replaced this one: AD 2016-05-12. Comply with the one in force.
This AD applies to all The Boeing Company Model 747-100B SUD, 747-300, 747-400, and 747-400D series airplanes; and Model 747-200B series airplanes having a stretched upper deck; certificated in any category; excluding airplanes that have been converted to a large cargo freighter configuration.
We are superseding an existing airworthiness directive (AD) for all Model 747-100B SUD, 747-300, 747-400, and 747-400D series airplanes; and Model 747-200B series airplanes having a stretched upper deck. The existing AD currently requires repetitively inspecting for cracking or discrepancies of the fasteners in the tension ties, shear webs, and frames at body stations 1120 through 1220; and related investigative and corrective actions if necessary. That AD requires modifying the frame-to-tension-tie joints at body stations 1120 through 1220 (including related investigative actions and corrective actions if necessary), which provides a terminating action for the repetitive inspections. That AD also requires new repetitive inspections after the modification, corrective actions if necessary, and additional modification requirements at a specified time after the first modification. That AD also removed certain airplanes from the applicability. That AD was prompted by reports of cracked and severed tension ties, broken fasteners, and cracks in the frame, shear web, and shear ties adjacent to tension ties for the upper deck. This AD revises the existing AD by adding repetitive open hole high frequency eddy current (HFEC) inspections for cracking in the forward and aft tension tie channels, and repair if necessary. For certain airplanes, this AD also requires a one-time angle inspection to determine if the angle is installed correctly, and re-installation if necessary; and a one-time open hole HFEC inspection at the fastener locations where the tension tie previously attached to the frame prior to certain modifications, and repair if necessary. This AD also, for the Stage 2 inspections, reduces the initial compliance times for those inspections. We are issuing this AD to detect and correct cracking of the tension ties, shear webs, and frames of the upper deck, which could result in rapid decompression and reduced structural integrity of the airplane.
This paragraph restates the requirements of paragraph (f) of AD 2007-23-18, Amendment 39-15266 (72 FR 65655, November 23, 2007). For all airplanes: Do detailed inspections for cracking or discrepancies of the fasteners in the tension ties, shear webs, and frames at body stations 1120 through 1220, and related investigative and corrective actions as applicable, by doing all actions specified in and in accordance with “Stage 1 Inspection” of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2507, dated April 21, 2005, except as provided by paragraph (k) of this AD; or Boeing Alert Service Bulletin 747-53A2507, Revision 1, dated January 14, 2010. As of the effective date of this AD only Boeing Alert Service Bulletin 747-53A2507, Revision 1, dated January 14, 2010, may be used. Do the Stage 1 inspections at the applicable times specified in paragraphs (h) and (i) of this AD, except as provided by paragraphs (g)(1) and (g)(2) of this AD. Accomplishment of the initial Stage 2 inspection required by paragraph (j) of this AD terminates the requirements of this paragraph. Any applicable related investigative and corrective actions must be done before further flight. Doing the modification required by paragraph (q) of this AD terminates the repetitive inspection requirements of this paragraph.
(1) Where paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2507, dated April 21, 2005, specifies a compliance time relative to “the original issue date on this service bulletin,” this AD requires compliance before the specified compliance time after April 26, 2006 (the effective date of AD 2006-06-11, Amendment 39-14520 (71 FR 14367, March 22, 2006)).
(2) For any airplane that reaches the applicable compliance time for the initial Stage 2 inspection (as specified in Table 1, Compliance Recommendations, under paragraph 1.E., of Boeing Alert Service Bulletin 747-53A2507, dated April 21, 2005) before reaching the applicable compliance time for the initial Stage 1 inspection: Accomplishment of the initial Stage 2 inspection eliminates the need to do the Stage 1 inspections.
This paragraph restates the requirements of paragraph (g) of AD 2007-23-18, Amendment 39-15266 (72 FR 65655, November 23, 2007). Do the initial Stage 1 inspection at the earlier of the times specified in paragraphs (h)(1) and (h)(2) of this AD.
(1) At the earlier of the times specified in paragraphs (h)(1)(i) and (h)(1)(ii) of this AD.
(i) At the applicable time specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2507, dated April 21, 2005.
(ii) Before the accumulation of 10,000 total flight cycles, or within 250 flight cycles after November 28, 2007 (the effective date of AD 2007-23-18, Amendment 39-15266 (72 FR 65655, November 23, 2007), whichever occurs later.
(2) At the later of the times specified in paragraphs (h)(2)(i) and (h)(2)(ii) of this AD.
(i) Before the accumulation of 12,000 total flight cycles.
(ii) Within 50 flight cycles or 20 days, whichever occurs first, after November 28, 2007 (the effective date of AD 2007-23-18, Amendment 39-15266 (72 FR 65655, November 23, 2007).
This paragraph restates the requirements of paragraph (h) of AD 2007-23-18, Amendment 39-15266 (72 FR 65655, November 23, 2007). Repeat the Stage 1 inspection specified in paragraph (g) of this AD at the time specified in paragraph (i)(1) or (i)(2) of this AD, as applicable. Repeat the inspection thereafter at intervals not to exceed 250 flight cycles, until the initial Stage 2 inspection required by paragraph (j) of this AD has been done.
(1) For airplanes on which the initial Stage 1 inspection has not been accomplished as of November 28, 2007 (the effective date of AD 2007-23-18, Amendment 39-15266 (72 FR 65655, November 23, 2007): Do the next inspection before the accumulation of 10,000 total flight cycles, or within 250 flight cycles after the initial Stage 1 inspection done in accordance with paragraph (g) of this AD, whichever occurs later.
(2) For airplanes on which the initial Stage 1 inspection has been accomplished as of November 28, 2007 (the effective date of AD 2007-23-18, Amendment 39-15266 (72 FR 65655, November 23, 2007): Do the next inspection at the applicable time specified in paragraph (i)(2)(i) or (i)(2)(ii) of this AD.
(i) For airplanes that have accumulated fewer than 12,000 total flight cycles as of November 28, 2007 (the effective date of AD 2007-23-18, Amendment 39-15266 (72 FR 65655, November 23, 2007): Do the next inspection before the accumulation of 10,000 total flight cycles, or within 250 flight cycles after November 28, 2007, whichever occurs later.
(ii) For airplanes that have accumulated 12,000 total flight cycles or more as of November 28, 2007 (the effective date of AD 2007-23-18, Amendment 39-15266 (72 FR 65655, November 23, 2007): Do the next inspection at the later of the times specified in paragraphs (i)(2)(ii)(A) and (i)(2)(ii)(B) of this AD.
(A) Within 250 flight cycles after accomplishment of the initial Stage 1 inspection.
(B) Within 50 flight cycles or 20 days, whichever occurs first, after November 28, 2007 (the effective date of AD 2007-23-18, Amendment 39-15266 (72 FR 65655, November 23, 2007).
This paragraph restates the requirements of paragraph (i) of AD 2007-23-18, Amendment 39-15266 (72 FR 65655, November 23, 2007). For all airplanes: Do detailed and high frequency eddy current inspections for cracking or discrepancies of the fasteners in the tension ties, shear webs, and frames at body stations 1120 through 1220, and related investigative and corrective actions as applicable, by doing all actions specified in and in accordance with “Stage 2 Inspection” of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2507, dated April 21, 2005; or Boeing Alert Service Bulletin 747-53A2507, Revision 1, dated January 14, 2010; except as provided by paragraph (k) of this AD. Do the initial inspections at the earlier of the times specified in paragraphs (j)(1) and (j)(2) of this AD. Repeat the Stage 2 inspection thereafter at the applicable times specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2507, dated April 21, 2005. As of the effective date of this AD only Boeing Alert Service Bulletin 747-53A2507, Revision 1, dated January 14, 2010, may be used. Any applicable related investigative and corrective actions must be done before further flight. Accomplishment of the initial Stage 2 inspection ends the repetitive Stage 1 inspections. Doing the modification required by paragraph (q) of this AD terminates the repetitive inspection requirements of this paragraph.
(1) Before the accumulation of 16,000 total flight cycles, or within 1,000 flight cycles after November 28, 2007 (the effective date of AD 2007-23-18, Amendment 39-15266 (72 FR 65655, November 23, 2007), whichever occurs later.
(2) Before the accumulation of 10,000 total flight cycles, or within 1,000 flight cycles after the effective date of this AD, whichever occurs later.
This paragraph restates the requirements of paragraph (j) of AD 2007-23-18, Amendment 39-15266 (72 FR 65655, November 23, 2007). If any discrepancy including but not limited to any crack, broken fastener, loose fastener, or missing fastener is found during any inspection required by paragraph (g), (h), (i), or (j) of this AD, and Boeing Alert Service Bulletin 747-53A2507, dated April 21, 2005; or Boeing Alert Service Bulletin 747-53A2507, Revision 1, dated January 14, 2010; specifies to contact Boeing for appropriate action: Before further flight, repair the discrepancy using a method approved in accordance with the procedures specified in paragraph (r) of this AD.
For all airplanes: Except as provided by paragraph (o) of this AD; at the time specified in paragraph 1.E, “Compliance,” of Boeing Alert Service Bulletin 747-53A2507, Revision 1, dated January 14, 2010; do an open hole high frequency eddy current (HFEC) inspection for cracking in the forward and aft tension tie channels at 12 fastener locations inboard of the aluminum straps at STA 1140, and before further flight do all applicable repairs. Do all actions in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2507, Revision 1, dated January 14, 2010. Repeat the inspections thereafter at the time specified in paragraph 1.E., “Compliance” of Boeing Alert Service Bulletin 747-53A2507, Revision 1, dated January 14, 2010. Doing the modification required by paragraph (p) of this AD terminates the inspection requirements in this paragraph.
For Group 1, Configuration 1, airplanes as identified in Boeing Alert Service Bulletin 747-53A2507, Revision 1, dated January 14, 2010: Except as provided by paragraph (o) of this AD, at the time specified in paragraph 1.E, “Compliance,” of Boeing Alert Service Bulletin 747-53A2507, Revision 1, dated January 14, 2010, do a detailed inspection to determine if the angle is installed correctly, and before further flight re-install all angles that were installed incorrectly. Do all actions in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2507, Revision 1, dated January 14, 2010.
For Group 1, Configuration 2, airplanes; and Group 2 and 3 airplanes; as identified in Boeing Alert Service Bulletin 747-53A2507, Revision 1, dated January 14, 2010: Except as provided by paragraph (o) of this AD, at the time specified in paragraph 1.E, “Compliance,” of Boeing Alert Service Bulletin 747-53A2507, Revision 1, dated January 14, 2010, do an open hole HFEC inspection for cracks at the fastener locations (STA 1120, 1160, 1200, and 1220) where the tension tie previously attached to the frame prior to modification to the Boeing special freighter or Boeing Converted Freighter configuration, and before further flight do all applicable repairs. Do all actions in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2507, Revision 1, dated January 14, 2010. Doing the modification required by paragraph (p) of this AD terminates the one-time inspection requirements in this paragraph.
Where paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2507, Revision 1, dated January 14, 2010, specifies a compliance time relative to “the Revision 1 date of this service bulletin,” this AD requires compliance within the specified compliance time after the effective date of this AD.
Except as provided by paragraphs (p)(1) and (p)(2) of this AD: At the applicable times specified in paragraph 1.E, “Compliance,” of Boeing Service Bulletin 747-53A2559, Revision 1, dated August 4, 2011, modify the frame-to-tension-tie joints at body stations (STA) 1120 through 1220; do all related investigative and applicable corrective actions; do the repetitive post-modification detailed inspections for cracking of the tension tie and frame structure and all applicable corrective actions; and do the additional modification. Do all actions in accordance with the Accomplishment Instructions of Boeing Service Bulletin 747-53A2559, Revision 1, dated August 4, 2011. Modifying the frame-to-tension-tie joints at body stations 1120 through 1220 terminates the repetitive inspection requirements of paragraphs (g) and (j) of this AD, the inspection requirements of paragraph (l) of this AD, and the one-time inspection requirements of paragraph (n) of this AD.
(1) Where paragraph 1.E., “Compliance,” of Boeing Service Bulletin 747-53A2559, Revision 1, dated August 4, 2011, specifies a compliance time relative to “the original issue date of this service bulletin,” this AD requires compliance within the specified compliance time after the effective date of this AD.
(2) Where Boeing Service Bulletin 747-53A2559, Revision 1, dated August 4, 2011, specifies to contact Boeing for repair instructions or additional modification requirements: Before further flight, repair the cracking or do the additional actions using a method approved in accordance with the procedures specified in paragraph (r) of this AD.
This paragraph provides credit for the corresponding actions required by this AD, if those actions were done before the effective date of this AD using Boeing Alert Service Bulletin 747-53A2559, dated January 8, 2009.