Airworthiness Directive · Amendment 39-17111 · Ice and rain protection
The Boeing Company Airplanes
This AD applies to The Boeing Company Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400, 747-400D, 747-400F, 747SR, and 747SP series airplanes, certificated in any category; as identified in Boeing Service Bulletin 747-30-2081, Revision 3, dated December 5, 2011.
We are adopting a new airworthiness directive (AD) for certain The Boeing Company Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400, 747-400D, 747-400F, 747SR, and 747SP series airplanes. This AD was prompted by several reports of electrical arcs at terminal "A" of the electrically heated flight deck window 1. This AD requires repetitive inspections for damage of the electrical connections at terminal "A" of the left and right flight deck window 1, and corrective actions if necessary. This AD also allows for replacing a flight deck window 1 with a new improved flight deck window 1 equipped with different electrical connections, which would terminate the repetitive inspections for that window. We are issuing this AD to prevent smoke and fire in the cockpit, which could lead to loss of visibility, and injuries to or incapacitation of the flight crew.
Within 500 flight hours after the effective date of this AD, do a detailed inspection for damage (including but not limited to a cross-threaded screw, arcing, loose terminal, and heat damage) of the electrical terminal “A” block, connector, and wiring of the left and right flightdeck window 1, and do all applicable corrective actions, by accomplishing the actions specified in Work Packages 1 and 2 of the Accomplishment Instructions of Boeing Service Bulletin 747-30-2081, Revision 3, dated December 5, 2011. Except as provided by paragraph (i) of this AD, do all applicable corrective actions before further flight. Except as required by paragraph (h) of this AD, repeat the detailed inspection thereafter at the applicable intervals specified in paragraph (g)(1) or (g)(2) of this AD. Doing the replacement specified in paragraph (j) of this AD terminates the repetitive inspection requirements of this paragraph for the replaced flightdeck window 1.
(1) For flightdeck window 1 manufactured by GKN with screw/connector electrical connections: Repeat the detailed inspection at intervals not to exceed 12,000 flight hours or 48 months, whichever occurs later.
(2) For flightdeck window 1 manufactured by PPG with screw/connector electrical connections: Repeat the detailed inspection at intervals not to exceed 6,000 flight hours or 24 months, whichever occurs later.
For any window 1 that is replaced with a window 1 that uses screw and connector for the electrical heat connection in accordance with Work Package 1 or 2 of the Accomplishment Instructions of Boeing Service Bulletin 747-30-2081, Revision 3, dated December 5, 2011: Within 500 flight hours after the corrective action, do a detailed inspection, in accordance with Work Package 1 or 2, as applicable, of the Accomplishment Instructions of Boeing Service Bulletin 747-30-2081, Revision 3, dated December 5, 2011, and repeat the detailed inspection thereafter at the applicable intervals specified in paragraph (g)(1) or (g)(2) of this AD. Doing the replacement specified in paragraph (j) of this AD terminates the repetitive inspection requirements of this paragraph for the replaced flightdeck window 1.
If, during the inspection required by paragraph (g) or (h) of this AD, a screw is found crossthreaded, do the applicable corrective actions specified in paragraph (i)(1) or (i)(2) of this AD.
(1) If the connector is loose and cannot be tightened by applying the correct torque, before further flight, replace that window 1 in accordance with the Accomplishment Instructions of Boeing Service Bulletin 747-30-2081, Revision 3, dated December 5, 2011.
(2) If the connector is tight or can be tightened by applying the correct torque, replace that window 1 within 500 flight hours after the inspection, in accordance with the Accomplishment Instructions of Boeing Service Bulletin 747-30-2081, Revision 3, dated December 5, 2011.
Replacing a flightdeck window 1 that uses screw and connector for the electrical heat connection with a flightdeck window 1 that uses pin and socket for the electrical connection, in accordance with Work Package 3 or 4 of the Accomplishment Instructions of Boeing Service Bulletin 747-30-2081, Revision 3, dated December 5, 2011, ends the repetitive inspection requirements of this AD for that window 1 only.