Airworthiness Directive · Amendment 39-17014 · Fuselage
Empresa Brasileira de Aeronautica S.A. (EMBRAER) Airplanes
(1) This AD applies to all Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model ERJ 170-100 LR, -100 STD, -100 SE., and -100 SU airplanes; and Model ERJ 170-200 LR, -200 SU, and -200 STD airplanes; certificated in any category.
(2) This AD requires revisions to certain operator maintenance documents to include new actions (e.g., inspections). Compliance with these actions is required by 14 CFR 91.403(c). For airplanes that have been previously modified, altered, or repaired in the areas addressed by these inspections, the operator may not be able to accomplish the actions described in the revisions. In this situation, to comply with 14 CFR 91.403(c), the operator must request approval for an alternative method of compliance according to paragraph (k) of this AD. The request should include a description of changes to the required inspections that will ensure the continued damage tolerance of the affected structure. The FAA has provided guidance for this determination in Advisory Circular (AC) 25.1529-1A (http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAdvisoryCircular.nsf/list/AC%2025.1529-1A/$FILE/AC%2025.1529-1A.pdf).
We are superseding an existing airworthiness directive (AD) for all EMBRAER Model ERJ 170 airplanes. That AD currently requires revising the Airworthiness Limitations Section (ALS) of the Instructions for Continued Airworthiness (ICA) to incorporate new structural inspection requirements. Since we issued that AD, during full scale fatigue testing, cracks were found in certain structural components of the airplane. Analysis of these cracks resulted in the manufacturer modifying the ALS of EMBRAER 170 Maintenance Review Board Report (MRBR), to include new inspections tasks, or modifying the current tasks and their respective thresholds and intervals. This new AD requires revising the maintenance program to incorporate new or revised structural inspection requirements. We are issuing this AD to detect and correct fatigue cracking which could result in the loss of structural integrity of the airplane.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
(1) Within 90 days after July 6, 2010 (the effective date of AD 2010-11-13, Amendment 39-16318 (75 FR 30284, June 1, 2010)), revise the ALS of the Instructions for Continued Airworthiness (ICA) to incorporate the inspection tasks identified in the EMBRAER temporary revisions (TRs) to Appendix A—Part 2 of the EMBRAER 170 MRBR MRB-1621 listed in table 1 of this AD.
(2) The initial compliance times for the tasks start from the applicable threshold times specified in the temporary revisions (TRs) for the corresponding tasks of the maintenance review board report or within 500 flight cycles after July 6, 2010, whichever occurs later. For certain tasks, the compliance times depend on the pre-modification and post-modification status of the actions specified in the associated service bulletin, as specified in the “Applicability” column of the applicable TRs identified in table 1 of this AD.
(3) The threshold values stated in the TRs referenced in table 1 of this AD are total flight cycles on the airplane since the date of issuance of the original Brazilian airworthiness certificate or the date of issuance of the original Brazilian export certificate of airworthiness.
| TR | Date | Subject | Task No. |
|---|---|---|---|
| TR 4-1 | October 15, 2007 | Ram air turbine compartment, support structure and cutout structure—internal | 53-10-012-0002 53-10-012-0003 |
| Nose landing gear wheel well metallic structure | 53-10-021-0005 53-10-021-0006 | ||
| TR 4-3 | December 6, 2007 | Wing stub spar 3 side fitting—internal | 57-01-012-001 |
| Wing upper skin panels—external | 57-10-010-0002 | ||
| Fixed trailing edge lower skin panel—external | 57-50-002-0002 | ||
| Fixed trailing edge rib 4A—external | 57-50-005-0003 | ||
| Fixed trailing edge rib 6—internal | 57-50-005-0004 | ||
| TR 4-4 | January 18, 2008 | Wing stub main box lower—internal | 57-01-002-003 |
Except as required by paragraph (i) of this AD, after accomplishing the actions specified in paragraph (g) of this AD, no alternative inspections or inspection intervals may be used unless the inspection or inspection interval is approved by the Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA, or the Agência Nacional de Aviação Civil (ANAC) (or its delegated agent); or unless the inspection or interval is approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (k)(1) of this AD.
(1) Within 60 days after the effective date of this AD: Revise the maintenance program to incorporate the new or revised tasks specified in Part 2—Airworthiness Limitation Inspection (ALI)—Structures, of Appendix A, Airworthiness Limitations, of the EMBRAER 170 MRBR MRB-1621, Revision 7, dated November 11, 2010; and EMBRAER Temporary Revision (TR) 7-1, dated February 11, 2011, to Part 2—Airworthiness Limitation Inspection (ALI)—Structures, of Appendix A, Airworthiness Limitations, of the EMBRAER 170 MRBR MRB-1621, Revision 7; with the initial compliance times and intervals specified in these documents.
(2) The initial compliance times for the tasks start from the date of issuance of the original Brazilian airworthiness certificate or the date of issuance of the original Brazilian export certificate of airworthiness of the applicable airplane at the applicable time specified in the tasks, or within 600 flight cycles after revising the maintenance program, whichever occurs later. For certain tasks, the compliance times depend on the pre-modification and post-modification status of the actions specified in the associated service bulletin, as specified in the “Applicability” column of Part 2—Airworthiness Limitation Inspection (ALI)—Structures, of Appendix A, Airworthiness Limitations, of the EMBRAER 170 MRBR MRB-1621, Revision 7, dated November 11, 2010; and EMBRAER Temporary Revision 7-1, dated February 11, 2011, to Part 2—Airworthiness Limitation Inspection (ALI)—Structures, of Appendix A, Airworthiness Limitations of the EMBRAER 170 MRBR MRB-1621, Revision 7.
(3) For tasks identified in the documents identified in paragraph (i)(1) of this AD, doing the initial task required by this paragraph terminates the requirements of paragraph (g) of this AD for that task.
After accomplishing the revisions required by paragraph (i) of this AD, no alternative actions (e.g., inspections), intervals, and/or CDCCLs may be used other than those specified in Part 2—Airworthiness Limitation Inspection (ALI)—Structures, of Appendix A, Airworthiness Limitations, of the EMBRAER 170 MRBR MRB-1621, Revision 7, dated November 11, 2010; and EMBRAER Temporary Revision 7-1, dated February 11, 2011, to Part 2—Airworthiness Limitation Inspection (ALI)—Structures, of Appendix A, Airworthiness Limitations, of the EMBRAER 170 MRBR MRB-1621, Revision 7, unless the actions, intervals, and/or CDCCLs are approved as an AMOC in accordance with the procedures specified in paragraph (k)(1) of this AD.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.