Airworthiness Directive · Amendment 39-16731 · Flight controls
Bombardier, Inc. Model DHC-8-400 Series Airplanes
Superseded. A later AD replaced this one: AD 2013-13-17. Comply with the one in force.
This AD applies to Bombardier, Inc. Model DHC-8-400, -401, and -402 airplanes having serial numbers (S/Ns) 4001 through 4304 inclusive; certificated in any category.
We are adopting a new airworthiness directive (AD) for the products listed above. This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
At the applicable time specified in paragraph (g)(1) or (g)(2) of this AD: Perform a free-play check for any shaft swaged bearing having part number (P/N) MS14103-7 that is installed in the tailstock end of each elevator PCU (three PCUs per elevator surface), having P/Ns 390600-1007 and 390600-1009, in accordance with paragraph 3.B., Part A, of Bombardier Service Bulletin 84-27-52, dated May 25, 2010.
(1) For airplanes that have accumulated 8,000 or more total flight hours as of the effective date of this AD: Within 2,000 flight hours after the effective date of this AD.
(2) For airplanes that have accumulated less than 8,000 total flight hours as of the effective date of this AD: Within 6,000 flight hours after the effective date of this AD or before the accumulation of 10,000 total flight hours, whichever occurs first.
(h) If, during the check required by paragraph (g) of this AD, the bearing free-play is within the limits specified in Bombardier Service Bulletin 84-27-52, dated May 25, 2010, no further action is required by this AD.
(i) If, during the check required by paragraph (g) of this AD, the bearing free-play exceeds the limits specified in Bombardier Service Bulletin 84-27-52, dated May 25, 2010: Before further flight, replace the elevator PCU with a serviceable one, in accordance with paragraph 3.B., Part B, of Bombardier Service Bulletin 84-27-52, dated May 25, 2010.
Note 1: This AD differs from the MCAI and/or service information as follows: No differences.