Airworthiness Directive · Amendment 39-16576 · Landing gear
The Boeing Company Model 757 Airplanes
This AD applies to all The Boeing Company Model 757-200, -200PF, -200CB, and -300 series airplanes, certificated in any category.
The FAA is adopting a new airworthiness directive (AD) for Model 757-200, -200PF, -200CB, and -300 series airplanes. This AD requires an inspection of the two spring arms in the spin brake assemblies in the nose wheel well to determine if the spring arms are made of aluminum or composite material, and repetitive related investigative/corrective actions if necessary. This AD also provides options for terminating the repetitive actions. This AD results from reports of cracked and broken aluminum springs. We are issuing this AD to detect and correct cracked or broken springs. A cracked or broken spring could separate from the airplane and result in potential hazard to persons or property on the ground, or ingestion into the engine with engine damage and potential shutdown, or damage to the airplane.
Comply with this AD within the compliance times specified, unless already done.
At the applicable time specified in paragraph 1.E., “Compliance,” of Boeing Special Attention Service Bulletin 757-32-0176, Revision 1, dated October 16, 2008, except that where Boeing Special Attention Service Bulletin 757-32-0176, Revision 1, dated October 16, 2008, specifies a compliance time after the date “on this service bulletin,” this AD requires compliance within the specified compliance time after the effective date of this AD: Do a general visual inspection to determine the material (aluminum or composite) of the two springs in the spin brake assemblies in the nose wheel well. A review of airplane maintenance records is acceptable in lieu of this inspection if the material can be conclusively determined from that review. At the applicable time specified in paragraph 1.E., “Compliance,” of Boeing Special Attention Service Bulletin 757-32-0176, Revision 1, dated October 16, 2008, do all applicable related investigative and corrective actions, and all repetitive inspections thereafter in accordance with Parts 2 through 5 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 757-32-0176, Revision 1, dated October 16, 2008; except as provided by paragraph (j) of this AD.
Replacing an aluminum spin brake assembly with a spin brake assembly made of composite material in accordance with Figure 5 of Boeing Special Attention Service Bulletin 757-32-0176, Revision 1, dated October 16, 2008, ends the repetitive inspections required by paragraph (g) of this AD for that spring.
(i) Replacing an aluminum spring with a spring made of corrosion-resistant steel (CRES), in accordance with Figure 6 of Boeing Special Attention Service Bulletin 757-32-0176, Revision 1, dated October 16, 2008, ends the repetitive inspections required by paragraph (g) of this AD for that spring.
A serviceable spin brake assembly may be used to replace a cracked part, provided that it has been inspected and all applicable related investigative and corrective actions have been applied in accordance with the requirements of paragraph (g) of this AD.
As of the effective date of this AD, no person may install an aluminum spring on any airplane unless it has been inspected and all applicable related investigative and corrective actions have been applied in accordance with the requirements of paragraph (g) of this AD.
Actions done before the effective date of this AD in accordance with Boeing Special Attention Service Bulletin 757-32-0176, dated September 10, 2007, are acceptable for compliance with the corresponding requirements of this AD.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Aircraft