Airworthiness Directive · Amendment 39-16466 · Fuselage
Airbus Model A300 B4-600 Series Airplanes, Model A300 B4-600R Series Airplanes, Model A300 C4-605R Variant F Airplanes, and Model A300 F4-600R Series Airplanes (Collectively Called A300-600 Series Airplanes)
This AD applies to Airbus Model A300 B4-601, B4-603, B4-620, B4-622, B4-605R, and B4-622R airplanes; Model A300 C4-605R Variant F airplanes; and Model A300 F4-605R and F4-622R airplanes; certificated in any category; on which modification 12699 has not been completed.
We are adopting a new airworthiness directive (AD) for the products listed above. This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
Except for airplanes identified in paragraph (h) of this AD: At the time specified in paragraph (g)(1) or (g)(2) of this AD, as applicable, reinforce the junctions of frame bases FR48, FR49, FR51, FR52 and FR53, which includes doing a dimensional measurement of the holes, doing an eddy current inspection of the holes for cracking, doing a cold expansion of the holes, installing fasteners, and doing applicable corrective actions, in accordance with the Accomplishment Instructions of Airbus Mandatory Service Bulletin A300-53-6161, Revision 02, dated October 16, 2009. If cracking is found, before further flight, contact Airbus for repair instructions and do the repair.
(1) For airplanes on which Airbus Modification No. 03986 has been accomplished as of the effective date of this AD: Before the accumulation of 37,600 total flight cycles.
(2) For airplanes on which Airbus Modification No. 03986 has not been accomplished as of the effective date of this AD: Before the accumulation of 28,900 total flight cycles.
(h) For airplanes modified prior to the effective date of this AD in accordance with the Accomplishment Instructions of Airbus Mandatory Service Bulletin A300-53-6161, dated February 13, 2009; or Revision 01, dated June 24, 2009: Within 10 days after the effective date of this AD, prior to doing any cold working process, determine if an eddy current inspection for cracking has been done, in accordance with the Accomplishment Instructions of Airbus Mandatory Service Bulletin A300-53-6161, Revision 02, dated October 16, 2009. If the eddy current inspection has not been done, or it cannot be proven that it has been done, contact Airbus for instructions and accomplish those instructions within 100 flight cycles after the effective date of this AD.
Note 1: This AD differs from the MCAI and/or service information as follows: No differences.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.