Airworthiness Directive · Amendment 39-16234 · The Boeing Company Model 767-200, -300, and -300F Series Airplanes
The Boeing Company Model 767-200, -300, and -300F Series Airplanes
This AD applies to The Boeing Company Model 767-200, -300, and -300F series airplanes, certificated in any category; as identified in Boeing Service Bulletin 767-28A0094, Revision 1, dated April 23, 2009.
Note 1: This AD requires revisions to certain operator maintenance documents to include new inspections. Compliance with these inspections is required by 14 CFR 91.403(c). For airplanes that have been previously modified, altered, or repaired in the areas addressed by these inspections, the operator may not be able to accomplish the inspections described in the revisions. In this situation, to comply with 14 CFR 91.403(c), the operator must request approval for an alternative method of compliance (AMOC) according to paragraph (k) of this AD. The request should include a description of changes to the required inspections that will ensure the continued operational safety of the airplane.
We are adopting a new airworthiness directive (AD) for certain Model 767-200, -300, and -300F series airplanes. For certain airplanes, this AD requires installing support hardware and modifying the interfacing wiring of the fuel quantity indicating system (FQIS) densitometer. For certain other airplanes, this AD requires replacing the existing hot short protector (HSP) on the FQIS densitometer with a new HSP. This AD also requires revising the Airworthiness Limitations (AWL) section of the Instructions for Continued Airworthiness to incorporate AWL No. 28-AWL-22. This AD results from fuel system reviews conducted by the manufacturer. We are issuing this AD to prevent the center tank fuel densitometer from overheating and becoming a potential ignition source inside the center fuel tank, which, in combination with flammable fuel vapors, could result in a center fuel tank explosion and consequent loss of the airplane.
Comply with this AD within the compliance times specified, unless already done.
Within 60 months after the effective date of this AD, do the actions specified in paragraphs (f)(1) and (f)(2) of this AD, as applicable, in accordance with the Accomplishment Instructions of Boeing Service Bulletin 767-28A0094, Revision 1, dated April 23, 2009.
(1) For Group 1 airplanes, Group 2 airplanes, Configuration 1, and Group 3 airplanes: Install support hardware and modify the interfacing wiring of the FQIS densitometer.
(2) For Group 4 airplanes: Replace the existing HSP with a new HSP.
Note 2: In Figure 9, Step 8, of the Accomplishment Instructions of Boeing Service Bulletin 767-28A0094, Revision 1, dated April 23, 2009, the ground identification number is identified as GD19393S; however, the correct ground identification number is GD10393S.
Actions done before the effective date of this AD in accordance with Boeing Alert Service Bulletin 767-28A0094, dated November 20, 2007, are acceptable for compliance with the requirements of paragraph (f) of this AD.
Concurrently with accomplishing the actions required by paragraph (f) of this AD, revise the AWL section of the Instructions for Continued Airworthiness by incorporating AWL No. 28-AWL-22 into the Boeing 767 Maintenance Planning Data (MPD) Document, D622T001-9, Section 9, Revision May 2009.
(i) After the actions specified in paragraph (h) of this AD have been accomplished, no alternative CDCCL for AWL No. 28-AWL-22 may be used, unless the CDCCL is approved as an AMOC in accordance with the procedures specified in paragraph (k) of this AD.
Incorporating AWL No. 28-AWL-22 into the AWL section of the Instructions for Continued Airworthiness in accordance with paragraph (g)(2) of AD 2008-11-01, amendment 39-15523, terminates the action required by paragraph (h) of this AD.