Airworthiness Directive · Amendment 39-16156 · Fuselage
McDonnell Douglas Corporation Model DC-10-10, DC-10-10F, DC-10-15, DC-10-30, DC-10-30F (KC-10A and KDC-10), DC-10-40, DC-10-40F, MD-10-10F, and MD-10-30F Airplanes
Superseded. A later AD replaced this one: AD 2012-19-03. Comply with the one in force.
This AD applies to McDonnell Douglas Corporation Model DC-10-10, DC-10-10F, DC-10-15, DC-10-30, DC-10-30F (KC-10A and KDC-10), DC-10-40, and DC-10-40F airplanes, and MD-10-10F and MD-10-30F airplanes that have been converted from Model DC-10 series airplanes; certificated in any category; with manufacturer's fuselage numbers as identified in the applicable service bulletin listed in Table 1 of this AD.
| Boeing Service Bulletin— | Revision— | Dated— | For airplanes with— |
|---|---|---|---|
| DC10-53-109 | 7 | March 3, 2009 | Extended wing-to-fuselage fillets. |
| DC10-53-111 | 6 | March 3, 2009 | Conventional wing-to-fuselage fillets. |
The FAA is superseding an existing airworthiness directive (AD), which applies to certain Model DC-10-10, DC-10-10F, DC-10-15, DC- 10-30, DC-10-30F (KC-10A and KDC-10), DC-10-40, and DC-10-40F airplanes. That AD currently requires installing or replacing with improved parts, as applicable, the bonding straps between the metallic frame of the fillet and the wing leading edge ribs, on both the left and right sides of the airplane. This new AD revises the applicability by adding and removing certain airplanes. This new AD requires, for certain airplanes, repositioning or replacing two bonding straps, and doing a bonding-resistance check and an inspection to determine correct installation of certain bonding straps, and applicable corrective actions. This AD results from fuel system reviews conducted by the manufacturer. We are issuing this AD to reduce the potential of ignition sources inside fuel tanks in the event of a severe lightning strike, which, in combination with flammable fuel vapors, could result in fuel tank explosions and consequent loss of the airplane.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
For airplanes with manufacturer's fuselage numbers identified in the applicable service bulletin listed in Table 2 of this AD: Within 7,500 flight hours or 60 months after September 7, 2006 (the effective date of AD 2006-16-03), whichever occurs earlier: Install or replace with improved parts, as applicable, the bonding straps between the metallic frame of the fillet and the wing leading edge ribs, on both the left and right sides of the airplane, in accordance with the Accomplishment Instructions of the applicable service bulletin identified in Table 2 of this AD or Table 1 of this AD. After the effective date of this AD, use the applicable service bulletin identified in Table 1 of this AD.
| McDonnell Douglas DC-10 Service Bulletin— | Revision— | Dated— | For airplanes with— |
|---|---|---|---|
| 53-109 | 4 | October 7, 1992 | Extended wing-to-fuselage fillets. |
| 53-111 | 3 | August 24, 1992 | Conventional wing-to-fuselage fillets. |
For airplanes with fuselage numbers not identified in Table 2 of this AD except for airplanes identified in paragraph (i) or (j) of this AD: Within 7,500 flight hours or 60 months, whichever occurs first after the effective date of this AD, install or replace with improved parts, as applicable, the bonding straps between the metallic frame of the fillet and the wing leading edge ribs, on both the left and right sides of the airplane. Do the actions in accordance with the Accomplishment Instructions of the applicable service bulletin identified in Table 1 of this AD.
(i) For Group 1-4, Configuration 3 airplanes, as identified in Boeing Service Bulletin DC10-53-109, Revision 7, dated March 3, 2009: Within 7,500 flight hours or 60 months after the effective date of this AD, whichever occurs first, do the actions specified in paragraphs (i)(1) and (i)(2) of this AD.
(1) Remove two braided bonding straps and install two longer braided bonding straps between the metallic frame of the fillet and the wing leading edge ribs, in accordance with the Accomplishment Instructions of Boeing Service Bulletin DC10-53-109, Revision 7, dated March 3, 2009.
(2) Measure the resistance of the previously installed bonding straps and, before further flight, do all applicable corrective actions, in accordance with the Accomplishment Instructions of Boeing Service Bulletin DC10-53-109, Revision 7, dated March 3, 2009.
For Group 1-2, Configuration 2 airplanes, as identified in Boeing Service Bulletin DC10-53-111, Revision 6, dated March 3, 2009: Within 7,500 flight hours or 60 months after the effective date of this AD, whichever occurs first, do the actions specified in paragraphs (j)(1) and (j)(2) of this AD.
(1) Do a general visual inspection to verify correct installation of the braided bonding straps (one left-hand wing and one right-hand wing) as shown in Sheet 7 in Figure 3 of Boeing Service Bulletin DC10-53-111, Revision 6, dated March 3, 2009, and, before further flight, do all applicable corrective actions, in accordance with the Accomplishment Instructions of Boeing Service Bulletin DC10-53-111, Revision 6, dated March 3, 2009.
(2) Measure the resistance of the previously installed bonding straps and, before further flight, do all applicable corrective actions, in accordance with the Accomplishment Instructions of Boeing Service Bulletin DC10-53-111, Revision 6, dated March 3, 2009.
Actions accomplished before the effective date of this AD according to Boeing Service Bulletin DC10-53-111, Revision 5, dated March 19, 2008; and Boeing Service Bulletin DC10-53-109, Revision 6, dated July 10, 2008; are considered acceptable for compliance with the corresponding action specified in this AD.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.