Airworthiness Directive · Amendment 39-16144 · General Electric Company CF34-1A, -3A, -3A1, -3A2, -3B, and -3B1 Turbofan Engines
General Electric Company CF34-1A, -3A, -3A1, -3A2, -3B, and -3B1 Turbofan Engines
This AD applies to General Electric Company (GE) CF34-1A, -3A, -3A1, -3A2, -3B, and -3B1 turbofan engines, with fan disks part numbers (P/Ns) 5921T18G01, 5921T18G09, 5921T18G10, 5921T54G01, 5922T01G02, 5922T01G04, 5922T01G05, 6020T62G04, 6020T62G05, 6078T00G01, 6078T57G01, 6078T57G02, 6078T57G03, 6078T57G04, 6078T57G05, and 6078T57G06 installed. These engines are installed on, but not limited to, Bombardier Canadair airplane models CL-600-2A12, -2B16, and -2B19.
The FAA is superseding an existing airworthiness directive (AD) for General Electric Company (GE) CF34-1A, -3A, -3A1, -3A2, -3B, and -3B1 turbofan engines. That AD currently requires a onetime visual and tactile inspection of certain areas of certain P/N and SN fan disks for an arc-out defect, within 20 engine flight hours after the effective date of that AD. This AD requires inspecting certain fan disks for electrical arc-out indications, removing from service fan disks with electrical arc-out indications, performing tactile and enhanced visual (TEV) inspections, fluorescent penetrant inspections (FPI), and eddy current inspections (ECI) on certain disks that have already had a shop-level inspection, and repetitive FPI and ECI on certain fan disks. This AD results from an updated risk analysis by GE that shows we need to take corrective action that is more stringent. We are issuing this AD to prevent an uncontained failure of the fan disk, which could result in damage to the airplane.
You are responsible for having the actions required by this AD performed within the compliance times specified unless the actions have already been done.
For fan disks listed by P/N and serial number (SN) in Table 2 of GE Alert Service Bulletin (ASB) CF34-BJ S/B 72-A0212, Revision 04, dated October 27, 2008; or in Table 2 of GE ASB CF34-AL S/B 72-A0233, Revision 04, dated October 27, 2008, that have 8,000 CSN or more on the effective date of this AD, remove fan disks from service.
(g) For fan disks listed by P/N and serial number (SN) in Table 2 of GE Alert Service Bulletin (ASB) CF34-BJ S/B 72-A0212, Revision 04, dated October 27, 2008; or in Table 2 of GE ASB CF34-AL S/B 72-A0233, Revision 04, dated October 27, 2008, that have fewer than 8,000 CSN on the effective date of this AD, remove fan disks from service before accumulating 8,000 CSN.
For CF34-3A1 engines with fan drive shaft, P/N 6036T78P02, and airworthiness limitation section life limit of 22,000 CSN, and CF34-3B1 turbofan engines with Tier 1 fan disks listed by P/N, SN, and Tier in Table 1 of GE ASB CF34-AL S/B 72-A0233, Revision 04, dated October 27, 2008, do the following:
(1) For Tier 1 fan disks not already inspected using GE ASB CF34-AL S/B 72-A0233, Revision 03, dated June 27, 2007, or earlier issue, do the following:
(i) Perform a TEV inspection, an FPI, and an ECI on the Tier 1 fan disks within 650 cycles-in-service (CIS) after the effective date of this AD. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0233, Revision 04, dated October 27, 2008, or use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0253, dated October 27, 2008, to perform the TEV inspection, FPI, and ECI.
(ii) Thereafter, perform repetitive ECI on the Tier 1 fan disks within intervals of 3,000 cycles-since-last inspection (CSLI). Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0252, dated October 27, 2008, to perform the repetitive ECI.
(2) For Tier 1 fan disks, listed by P/N, SN, and Tier in Table 1 of GE ASB CF34-AL S/B 72-A0233, Revision 04, dated October 27, 2008; already inspected using GE ASB CF34-AL S/B 72-A0233, Revision 03, dated June 27, 2007, or earlier issue, do the following:
(i) For Tier 1 fan disks with 2,500 or more CSLI on the effective date of this AD, perform an ECI on the Tier 1 fan disks within 500 CIS after the effective date of this AD. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0252, dated October 27, 2008, to perform the ECI.
(ii) For Tier 1 fan disks with fewer than 2,500 CSLI on the effective date of this AD, perform an ECI on the Tier 1 fan disks within 3,000 CSLI. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0252, dated October 27, 2008, to perform the ECI.
(iii) Thereafter, perform repetitive ECI on the Tier 1 fan disks within intervals of 3,000 CSLI. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0252, dated October 27, 2008, to perform the repetitive ECI.
(i) For CF34-3A1 engines with fan drive shaft, P/N 6036T78P02, and airworthiness limitation section life limit of 22,000 CSN, and CF34-3B1 turbofan engines with Tier 2 fan disks listed by P/N, SN, and Tier in Table 1 of GE ASB CF34-AL S/B 72-A0233, Revision 04, dated October 27, 2008, do the following:
(1) For Tier 2 fan disks not already inspected using GE ASB CF34-AL S/B 72-A0233, Revision 03, dated June 27, 2007, or earlier issue, do the following:
(i) Perform a TEV inspection, an FPI, and an ECI on the Tier 2 fan disks within 2,000 CIS after the effective date of this AD, or within 5,000 CIS after September 12, 2007, or by March 19, 2012, whichever occurs first. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0233, Revision 04, dated October 27, 2008, or use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0253, dated October 27, 2008, to perform the TEV inspection, FPI, and ECI.
(ii) Thereafter, perform repetitive eddy current inspections on the Tier 2 fan disks within intervals of 3,000 CSLI. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0252, dated October 27, 2008, to perform the repetitive ECI.
(2) For Tier 2 fan disks, listed by P/N, SN, and Tier in Table 1 of GE ASB CF34-AL S/B 72-A0233, Revision 04, dated October 27, 2008; already inspected using GE ASB CF34-AL S/B 72-A0233, Revision 03, dated June 27, 2007, or earlier issue, do the following:
(i) For Tier 2 fan disks with 2,500 or more CSLI on the effective date of this AD, perform an ECI on the Tier 2 fan disks within 500 CIS after the effective date of this AD. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0252, dated October 27, 2008, to perform the ECI.
(ii) For Tier 2 fan disks with fewer than 2,500 CSLI on the effective date of this AD, perform an ECI on the Tier 2 fan disks within 3,000 CSLI. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0252, dated October 27, 2008, to perform the ECI.
(iii) Thereafter, perform repetitive ECI on the Tier 2 fan disks within intervals of 3,000 CSLI. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0252, dated October 27, 2008, to perform the repetitive ECI.
For CF34-3A1 engines with fan drive shaft, P/N 6036T78P02, and airworthiness limitation section life limit of 22,000 CSN, and CF34-3B1 turbofan engines with Tier 3 fan disks, listed by P/N, SN, and Tier in Table 1 of GE ASB CF34-AL S/B 72-A0233, Revision 04, dated October 27, 2008, do the following:
(1) For Tier 3 fan disks not already inspected using GE ASB CF34-AL S/B 72-A0233, Revision 03, dated June 27, 2007, or earlier issue, perform a TEV inspection, an FPI, and an ECI on the Tier 3 fan disks within 5,000 CIS after September 12, 2007, or by March 19, 2012, whichever is earlier. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0233, Revision 04, dated October 27, 2008, or use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0253, dated October 27, 2008, to perform the TEV inspection, FPI, and ECI.
(2) For Tier 3 fan disks, listed by P/N, SN, and Tier in Table 1 of GE ASB CF34-AL S/B 72-A0233, Revision 04, dated October 27, 2008; already inspected using GE ASB CF34-AL S/B 72-A0233, Revision 03, dated June 27, 2007, or earlier issue, perform a TEV inspection and an ECI on the Tier 3 fan disks at the next shop visit. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0233, Revision 04, dated October 27, 2008, or use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0253, dated October 27, 2008, to perform the TEV inspection and ECI.
(3) Repetitive ECI on the Tier 3 fan disks are not required.
For CF34-3A1 turbofan engines with fan drive shaft, P/N 6036T78P02, and airworthiness limitation section life limit of 15,000 CSN, CF34-1A, CF34-3A, CF34-3A2, and CF34-3B turbofan engines with Tier 1 fan disks listed by P/N, SN, and Tier in Table 1 of GE ASB CF34-BJ S/B 72-A0212, Revision 04, dated October 27, 2008, do the following:
(1) For Tier 1 fan disks not already inspected using GE ASB CF34-BJ S/B 72-A0212, Revision 03, dated June 27, 2007, or earlier issue:
(i) Perform a TEV inspection, FPI, and ECI on the Tier 1 fan disks within 350 CIS after the effective date of this AD. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0212, Revision 04, dated October 27, 2008, or use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0234, dated October 27, 2008, to perform the TEV inspection, FPI, and ECI.
(ii) Thereafter, perform repetitive ECI on the Tier 1 fan disks within intervals of 3,000 CSLI. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-BJ S/B 72-A0235, dated October 27, 2008, to perform the repetitive ECI.
(2) For Tier 1 fan disks, listed by P/N, SN, and Tier in Table 1 of GE ASB CF34-BJ S/B 72-A0212, Revision 04, dated October 27, 2008; already inspected using GE ASB CF34-BJ S/B 72-A0212, Revision 03, dated June 27, 2007, or earlier issue, do the following:
(i) For Tier 1 fan disks with 2,500 or more CSLI on the effective date of this AD, perform an ECI on the Tier 1 fan disks within 500 CIS after the effective date of this AD. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-BJ S/B 72-A0235, dated October 27, 2008, to perform the ECI.
(ii) For Tier 1 fan disks with fewer than 2,500 CSLI on the effective date of this AD, perform an ECI on the Tier 1 fan disks within 3,000 CSLI after the effective date of this AD. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-BJ S/B 72-A0235, dated October 27, 2008, to perform the ECI.
(iii) Thereafter, perform repetitive ECI on the Tier 1 fan disks within intervals of 3,000 CSLI. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0235, dated October 27, 2008, to perform the repetitive ECI.
For CF34-3A1 turbofan engines with fan drive shaft, P/N 6036T78P02, and airworthiness limitation section life limit of 15,000 CSN, CF34-1A, CF34-3A, CF34-3A2, and CF34-3B turbofan engines with Tier 2 fan disks listed by P/N, SN, and Tier in Table 1 of GE ASB CF34-AL S/B 72-A0212, Revision 04, dated October 27, 2008, do the following:
(1) For Tier 2 fan disks not already inspected using GE ASB CF34-AL S/B 72-A0212, Revision 03, dated June 27, 2007, or earlier issue, do the following:
(i) Perform a TEV inspection, FPI, and ECI on the Tier 2 fan disks within 2,000 CIS after the effective date of this AD, or within 3,500 CSN after September 12, 2007, or by March 19, 2012, whichever occurs first. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0212, Revision 04, dated October 27, 2008, or use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0234, dated October 27, 2008, to perform the TEV inspection, FPI, and ECI.
(ii) Thereafter, perform repetitive ECI on the Tier 2 fan disks within intervals of 3,000 CSLI. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-BJ S/B 72-A0235, dated October 27, 2008, to perform the repetitive ECI.
(2) For Tier 2 fan disks, listed by P/N, SN, and Tier in Table 1 of GE ASB CF34-BJ S/B 72-A0212, Revision 04, dated October 27, 2008; already inspected using GE ASB CF34-BJ S/B 72-A0212, Revision 03, dated June 27, 2007, or earlier issue, do the following:
(i) For Tier 2 fan disks with 2,500 or more CSLI on the effective date of this AD, perform an ECI on the Tier 2 fan disks within 500 CIS after the effective date of this AD. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-BJ S/B 72-A0235, dated October 27, 2008, to perform the ECI.
(ii) For Tier 2 fan disks with fewer than 2,500 CSLI on the effective date of this AD, perform an ECI on the Tier 2 fan disks within 3,000 CSLI. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-BJ S/B 72-A0235, dated October 27, 2008, to perform the ECI.
(iii) Thereafter, perform repetitive ECI on the Tier 2 fan disks within intervals of 3,000 CSLI. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-BJ S/B 72-A0235, dated October 27, 2008, to perform the repetitive ECI.
For CF34-3A1 turbofan engines with fan drive shaft, P/N 6036T78P02, and airworthiness limitation section life limit of 15,000 CSN, CF34-1A, CF34-3A, CF34-3A2, and CF34-3B turbofan engines with Tier 3 fan disks listed by P/N, SN, and Tier in Table 1 of GE ASB CF34-BJ S/B 72-A0212, Revision 04, dated October 27, 2008, do the following:
(1) For Tier 3 fan disks not already inspected using GE ASB CF34-AL S/B 72-A0212, Revision 03, dated June 27, 2007, or earlier issue, perform a TEV inspection, FPI, and ECI on the Tier 3 fan disks within 3,500 CIS after September 12, 2007, or by March 19, 2012, whichever is earlier. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0212, Revision 04, dated October 27, 2008, or use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-AL S/B 72-A0234, dated October 27, 2008, to perform the TEV inspection, FPI, and ECI.
(2) For Tier 3 fan disks, listed by P/N, SN, and Tier in Table 1 of GE ASB CF34-BJ S/B 72-A0212, Revision 04, dated October 27, 2008; already inspected using GE ASB CF34-BJ S/B 72-A0212, Revision 03, dated June 27, 2007, or earlier issue, perform a TEV inspection and an ECI on the Tier 3 fan disks at the next shop visit. Use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-BJ S/B 72-A0212, Revision 04, dated October 27, 2008, or use paragraph 3.A of the Accomplishment Instructions of GE ASB CF34-BJ S/B 72-A0234, dated October 27, 2008, to perform the TEV inspection and ECI.
(3) Repetitive ECI on the Tier 3 fan disks are not required.