Airworthiness Directive · Amendment 39-16137 · Ice and rain protection
Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model EMB-135BJ, -135ER, -135KE, -135KL, -135LR, -145, -145ER, -145MR, -145LR, -145XR, -145MP, and -145EP Airplanes
This AD applies to EMBRAER Model EMB-135BJ, -135ER, -135KE, -135KL, -135LR, -145, -145ER, -145MR, -145LR, -145XR, -145MP, and -145EP airplanes, certificated in any category, except airplanes having serial numbers 14500921, 14500928, 14500932, 14500949, 14500958, 14500971, 14500973 and up, which will have in-factory modification incorporated.
We are adopting a new airworthiness directive (AD) for the products listed above. This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:
Unless already done, do the following actions.
(1) PART I—Within 500 flight hours or 3 months after the effective date of this AD, whichever occurs first, carry out a general visual inspection of both LH (left-hand) and RH (right-hand) engine anti-ice system valves to determine their P/N (part number).
(i) For engine anti-ice system valves with P/N C146009-2: No further action is required by paragraph (f)(1) of this AD.
(ii) For engine anti-ice system valves with P/N C146009-3: Before further flight, remove the valve and carry out a detailed inspection regarding its integrity; and carry out a special detailed inspection for an obstruction in the corresponding engine anti-ice system tubes; according to the detailed instructions and procedures described in Embraer Service Bulletin 145-30-0049, dated June 28, 2006, or Revision 01, dated October 19, 2006; or Embraer Service Bulletin 145LEG-30-0016, dated June 28, 2006, or Revision 01, dated February 5, 2007; as applicable.
(A) If the valve is damaged or the tube is obstructed, before further flight: Replace the valve with a serviceable or new valve bearing P/N C146009-2, C146009-3, or C146009-4; or remove all obstructions; as applicable; in accordance with the Accomplishment Instructions of Embraer Service Bulletin 145-30-0049, dated June 28, 2006, or Revision 01, dated October 19, 2006; or Embraer Service Bulletin 145LEG-30-0016, dated June 28, 2006, or Revision 01, dated February 5, 2007; as applicable.
(B) If the valve is not damaged or the tube is not obstructed, re-install the valve or install a serviceable or new valve bearing P/N C146009-2, C146009-3, or C146009-4; or re-install the tube; in accordance with the Accomplishment Instructions of Embraer Service Bulletin 145-30-0049, dated June 28, 2006, or Revision 01, dated October 19, 2006; or Embraer Service Bulletin 145LEG-30-0016, dated June 28, 2006, or Revision 01, dated February 5, 2007; as applicable.
(iii) For engine anti-ice system valves with P/N C146009-4: No further action is required by paragraph (f)(1) of this AD. In this case, paragraphs (f)(2), (f)(3), (f)(4), (f)(7), and (f)(8) of this AD are not applicable. However, paragraphs (f)(5) and (f)(6) of this AD must be accomplished.
(2) PART II—Within 1,500 flight hours or 9 months after the effective date of this AD, whichever occurs first, and thereafter at intervals that do not exceed 1,000 flight hours or 6 months, whichever occurs first, carry out a detailed inspection for damage of both LH and RH engine anti-ice system valves bearing P/N C146009-2 or C146009-3; and a special detailed inspection for obstruction of the corresponding engine anti-ice system tubes; according to the detailed instructions and procedures described in Embraer Service Bulletin 145-30-0049, dated June 28, 2006, or Revision 01, dated October 19, 2006; or Embraer Service Bulletin 145LEG-30-0016, dated June 28, 2006, or Revision 01, dated February 5, 2007; as applicable; and accomplish paragraphs (f)(2)(i) and (f)(2)(ii) of this AD, as applicable.
(i) If the valve is damaged or the tube is obstructed, before further flight: Replace the valve with a serviceable or new valve bearing P/N C146009-2, C146009-3, or C146009-4; or remove all obstructions; as applicable; in accordance with the Accomplishment Instructions of Embraer Service Bulletin 145-30-0049, dated June 28, 2006, or Revision 01, dated October 19, 2006; or Embraer Service Bulletin 145LEG-30-0016, dated June 28, 2006, or Revision 01, dated February 5, 2007; as applicable.
(ii) If the valve is not damaged, or the tube is not obstructed, before further flight: Re-install the valve or install a serviceable or new valve bearing P/N C146009-2 C146009-3, or C146009-4; or re-install the tube; as applicable; in accordance with the Accomplishment Instructions of Embraer Service Bulletin 145-30-0049, dated June 28, 2006, or Revision 01, dated October 19, 2006; or Embraer Service Bulletin 145LEG-30-0016, dated June 28, 2006, or Revision 01, dated February 5, 2007; as applicable.
(3) PART III—Any engine anti-ice system valve with P/N C146009-2 or C146009-3 that will be installed as a replacement, as provided for in paragraphs (f)(1) and (f)(2) of this AD, must undergo a detailed inspection for its integrity before installation, according to the detailed instructions and procedures described in Embraer Service Bulletin 145-30-0049, dated June 28, 2006, or Revision 01, dated October 19, 2006; or Embraer Service Bulletin 145LEG-30-0016, dated June 28, 2006, or Revision 01, dated February 5, 2007; as applicable; and additionally adhere to paragraphs (f)(3)(i) and (f)(3)(ii) of this AD, as applicable.
(i) If the valve is damaged, replace it with a serviceable or new valve bearing P/N C146009-2, C146009-3, or C146009-4; in accordance with the Accomplishment Instructions of Embraer Service Bulletin 145-30-0049, dated June 28, 2006, or Revision 01, dated October 19, 2006; or Embraer Service Bulletin 145LEG-30-0016, dated June 28, 2006, or Revision 01, dated February 5, 2007; as applicable.
(ii) If the valve is not damaged, installation is permitted.
(4) PART IV—Any engine anti-ice system tubes that will be installed on the airplane as a replacement, as provided for in paragraphs (f)(1) and (f)(2) of this AD, must undergo a special detailed inspection before installation, and all obstructions removed, according to the detailed instructions and procedures described in Embraer Service Bulletin 145-30-0049, dated June 28, 2006, or Revision 01, dated October 19, 2006; or Embraer Service Bulletin 145LEG-30-0016, dated June 28, 2006, or Revision 01, dated February 5, 2007; as applicable.
(5) PART V—If any engine anti-ice system valve with P/N C146009-4 has been found during the inspection required by paragraph (f)(1) of this AD, do paragraphs (f)(5)(i) or (f)(5)(ii) of this AD, as applicable, within 500 flight hours or 6 months after the effective date of this AD, whichever occurs first.
(i) If the valve was installed according to the detailed instructions and procedures described in Embraer Service Bulletin 145-30-0044, Revision 01, dated June 26, 2006, Revision 02, dated September 25, 2006, Revision 03, dated December 12, 2006, or Revision 04, dated May 14, 2008; or Embraer Service Bulletin 145LEG-30-0018, Revision 02, dated December 12, 2006, or Revision 03, dated May 14, 2008; as applicable: No further action is required by this AD.
(ii) If the valve was installed according to detailed instructions and procedures other than those specified in paragraph (f)(5)(i) of this AD: Carry out a special detailed inspection in the corresponding engine anti-ice system tubes, and repair all damage and remove all obstructions; according to the detailed instructions and procedures described in Embraer Service Bulletin 145-30-0049, dated June 28, 2006, or Revision 01, dated October 19, 2006; or Embraer Service Bulletin 145LEG-30-0016, dated June 28, 2006, or Revision 01, dated February 5, 2007; as applicable. After doing the actions specified in paragraph (f)(5)(ii) of this AD, no further action is required by this AD.
(6) PART VI—Before aircraft dispatch with one or two engine anti-ice system valves inoperative (Master Minimum Equipment List (MMEL) 30-21-01), carry out a detailed inspection for damage of the affected engine anti-ice system valves; and a special detailed inspection for obstruction of the corresponding engine anti-ice system tubes; and replace all damaged valves and remove all obstructions before further flight. Do all actions according to the detailed instructions and procedures described in Embraer Service Bulletin 145-30-0049, dated June 28, 2006, or Revision 01, dated October 19, 2006; or Embraer Service Bulletin 145LEG-30-0016, dated June 28, 2006, or Revision 01, dated February 5, 2007; as applicable; by accomplishing paragraph (f)(2) of this AD, unless the condition specified in paragraph (f)(6)(i) or (f)(6)(ii) of this AD has been met.
(i) Valves with P/N C146009-4 have been previously installed according to the detailed instructions and procedures described in Embraer Service Bulletin 145-30-0044, dated October 31, 2005; Embraer Service Bulletin 145LEG-30-0018, dated June 26, 2006; or Embraer Service Bulletin 145LEG-30-0018, Revision 01, dated September 25, 2006; as applicable; and additionally, paragraph (f)(5)(ii) of this AD has been accomplished.
(ii) Valves with P/N C146009-4 have been previously installed according to the detailed instructions and procedures described in Embraer Service Bulletin 145-30-0044, Revision 01, dated June 26, 2006, Revision 02, dated September 25, 2006, Revision 03, dated December 12, 2006, or Revision 04, dated May 14, 2008; or Embraer Service Bulletin 145LEG-30-0018, Revision 02, dated December 12, 2006, or Revision 03, dated May 14, 2008; as applicable.
(7) PART VII—Within 1,000 flight hours or 10 months after the effective date of this AD, whichever occurs first, install engine anti-ice system valves bearing P/N C146009-4 in the LH and RH engine positions, replacing P/N C146009-3, according to the detailed instructions and procedures described in Embraer Service Bulletin 145-30-0044, Revision 01, dated June 26, 2006, Revision 02, dated September 25, 2006, Revision 03, dated December 12, 2006, or Revision 04, dated May 14, 2008; or Embraer Service Bulletin 145LEG-30-0018, Revision 02, dated December 12, 2006, or Revision 03, dated May 14, 2008; as applicable.
(8) PART VIII—Within 1,000 flight hours or 10 months after the effective date of this AD, whichever occurs first, install engine anti-ice system valves bearing P/N C146009-4 in the LH and RH engine positions, replacing P/N C146009-2, according to the detailed instructions and procedures described in Embraer Service Bulletin 145-30-0044, Revision 01, dated June 26, 2006; Revision 02, dated September 25, 2006, Revision 03, dated December 12, 2006, or Revision 04, dated May 14, 2008; or Embraer Service Bulletin 145LEG-30-0018, Revision 02, dated December 12, 2006, or Revision 03, dated May 14, 2008; as applicable.
(9) PART IX—The installation of engine anti-ice system valves bearing P/N C146009-4 according to the detailed instructions and procedures described in Embraer Service Bulletin 145-30-0044, Revision 01, dated June 26, 2006, Revision 02, dated September 25, 2006, Revision 03, dated December 12, 2006; or Revision 04, dated May 14, 2008; or Embraer Service Bulletin 145LEG-30-0018, Revision 02, dated December 12, 2006, or Revision 03, dated May 14, 2008; as applicable; constitutes terminating action for this AD.
Note 1: For the purposes of this AD, a general visual inspection is: “A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure, or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to ensure visual access to all surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight, or droplight and may require removal or opening of access panels or doors. Stands, ladders, or platforms may be required to gain proximity to the area being checked.”
Note 2: For the purposes of this AD, a detailed inspection is: “An intensive examination of a specific item, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirror, magnifying lenses, etc., may be necessary. Surface cleaning and elaborate procedures may be required.”
Note 3: For the purposes of this AD, a special detailed inspection is: “An intensive examination of a specific item, installation, or assembly to detect damage, failure, or irregularity. The examination is likely to make extensive use of specialized inspection techniques and/or equipment. Intricate cleaning and substantial access or disassembly procedure may be required.”
Note 4: This AD differs from the MCAI and/or service information as follows (we have coordinated these differences with Agência Nacional de Aviação Civil (ANAC)): (1) “Part V” of the MCAI specifies a compliance time of within “1,500 flight hours or 9 months.” However, paragraph (f)(5) of this AD requires compliance “within 500 flight hours or 6 months” for the corresponding action. (2) “Part VII” of the MCAI specifies a compliance time of “within 2,500 flight hours or 12 months.” However, paragraph (f)(7) of this AD requires compliance “within 1,000 flight hours or 10 months” for the corresponding action. (3) “Part VIII” of the MCAI specifies a compliance time of “within 6,000 flight hours or 30 months.” However, paragraph (f)(8) of this AD requires compliance “within 1,000 flight hours or 10 months” for the corresponding action.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Aircraft