Airworthiness Directive · Amendment 39-16120 · Tail rotor drive
ZLT Zeppelin Luftschifftechnik GmbH & Co KG Model LZ N07-100 Airships
This AD applies to Model LZ N07-100 airships, serial numbers 002, 003, and 004, that are certificated in any category and are equipped with the following propeller gear boxes:
| Part No. | Serial No. | Designation |
|---|---|---|
| 07 722 0001-200 | 103, 106, 109, 112, 401, 401 | AFT propeller gear box. |
| 07 722 0002-200 | 101, 104, 107, 110, 201 | LH propeller gear box. |
| 07 722 0003-200 | 102, 105, 108, 111, 301, 302 | RH propeller gear box. |
We are adopting a new airworthiness directive (AD) for the products listed above. This AD results from mandatory continuing airworthiness information (MCAI) issued by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:
Unless already done, do the following actions in accordance with ZLT Zeppelin Luftschifftechnik GmbH & Co KG Service Bulletin S07 830 0001, Issue B-00, dated June 29, 2009:
(1) As of January 8, 2010 (the effective date of this AD), before the accumulation of the applicable total hours time-in-service (TIS) as defined in the appendix of ZLT Zeppelin Luftschifftechnik GmbH & Co KG Service Bulletin S07 830 0001, Issue B-00, dated June 29, 2009, replace the bevel gears of the propeller gearbox.
(2) As of January 8, 2010 (the effective date of this AD), for airships with a propeller gear box identified in paragraph (c)(1) of this AD that have exceeded the applicable total hours TIS as defined in the appendix of ZLT Zeppelin Luftschifftechnik GmbH & Co KG Service Bulletin S07 830 0001, Issue B-00, dated June 29, 2009, replace the bevel gears of the propeller gearbox within the next 30 days after January 8, 2010 (the effective date of this AD).
(3) As of January 8, 2010 (the effective date of this AD), airships with a propeller gear box S/N 102, 107, 108, 109, or 112, contact the manufacturer at ZLT Zeppelin Luftschifftecnik GmbH & Co KG, 88046 Friedrichsfafen, Allmannsweilerstrasse 132, Germany; telephone: + 49 (0) 7541-5900-546; fax: + 40 (0) 7541-5900-516, to obtain a repair scheme within the next 30 days after January 8, 2010 (the effective date of this AD). Incorporate the repair scheme before further flight after receipt.
(4) After doing the replacements required in paragraphs (f)(1), (f)(2), and (f)(3) of this AD, replace the bevel gears of the propeller gearbox thereafter at intervals not to exceed 1,600 hours TIS on the propeller gearbox.
Note 1: The time between overhaul for gear boxes specified in the airship maintenance manual remains unchanged.
Note 2: Airships with a propeller gear box S/N 102, 107, 108, 109, or 112 have exceeded their life limit and are not eligible for bevel gear replacement. See paragraph (f)(3) of this AD.
Note 3: This AD differs from the MCAI and/or service information as follows: No differences.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.