Airworthiness Directive · Amendment 39-16068 · Hydraulic power
Airbus Model A330-200 and -300 Series Airplanes; and Model A340-200 and -300 Series Airplanes
Superseded. A later AD replaced this one: AD 2013-25-08. Comply with the one in force.
This AD applies to all Airbus Model A330-201, −202, −203, −223, −243, −301, −302, −303, −321, −322, −323, −341, −342, and −343 series airplanes, all manufacturer serial numbers; and Model A340-211, −212, −213, −311, −312, and −313 series airplanes, all manufacturer serial numbers; certificated in any category.
We are adopting a new airworthiness directive (AD) for the products listed above. This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
Do the actions required by paragraphs (g)(1) through (g)(3) of this AD.
(1) For airplanes that do not have Airbus Modification 54491 embodied in production, or Airbus Service Bulletin A330-29-3101 or Airbus Service Bulletin A340-29-4078 embodied in service: Within 100 flight cycles or 28 days after the effective date of this AD, whichever occurs first, inspect the check valves on the blue, green, and yellow hydraulic systems to identify their P/Ns, in accordance with the instructions of Airbus All Operators Telex (AOT) A330-29A3111, Revision 1, dated October 8, 2009 (for Model A330-200 and -300 series airplanes); or AOT A340-29A4086, Revision 1, dated October 8, 2009 (for Model A340-200 and −300 series airplanes).
(i) If check valves having P/N CAR401 are installed on all three hydraulic systems, before further flight, do the actions specified in paragraph (g)(2)(i) of this AD. After accomplishing the actions required by paragraph (g)(2)(i) of this AD, do the actions specified in paragraphs (g)(2)(ii) and (g)(2)(iii) of this AD at the applicable compliance times specified in those paragraphs.
(ii) If check valves having P/N CAR401 are not installed on all three hydraulic systems, no further action is required until any check valve having P/N CAR400 is replaced with a check valve having P/N CAR401. If any check valve having P/N CAR400 is replaced by a check valve having P/N CAR401, before further flight, do the inspection specified in paragraph (g)(1) of this AD to determine if all three hydraulic systems are equipped with check valve having P/N CAR401.
(2) For airplanes on which Airbus Modification 54491 was embodied in production, or Airbus Service Bulletin A330-29-3101 or Airbus Service Bulletin A340-29-4078 was embodied in service, do the actions specified in paragraphs (g)(2)(i), (g)(2)(ii), and (g)(2)(iii) of this AD.
(i) Except as required by paragraph (g)(1)(i) of this AD, at the applicable times specified in paragraphs (g)(2)(i)(A) and (g)(2)(i)(B) of this AD, as applicable: Do the inspection program (detailed inspection of the lock wire for presence and integrity, a detailed inspection for traces of seepage or black deposits, and an inspection for proper torque) on yellow and blue high pressure manifolds, install new lock wires, and do all applicable corrective actions, in accordance with the instructions of paragraph 4.1.1 of Airbus AOT A330-29A3111, Revision 1, dated October 8, 2009 (for Model A330-200 and −300 series airplanes); or AOT A340-29A4086, Revision 1, dated October 8, 2009 (for Model A340-200 and −300 series airplanes). Do all applicable corrective actions before further flight.
(A) For airplanes on which Airbus Modification 54491 has been embodied in production: At the later of the times specified in paragraphs (g)(2)(i)(A)(1) and (g)(2)(i)(A)(2) of this AD.
(1) Before the accumulation of 1,000 total flight cycles since first flight but no earlier than the accumulation of 700 total flight cycles since first flight.
(2) Within 100 flight cycles or 28 days after the effective date of this AD, whichever occurs first.
(B) For airplanes on which Airbus Service Bulletin A330-29-3101 or A340-29-4078 was embodied in service: At the later of the times specified in paragraphs (g)(2)(i)(B)(1) and (g)(2)(i)(B)(2) of this AD.
(1) Within 1,000 flight cycles since the embodiment of Airbus Service Bulletin A330-29-3101 or A340-29-4078 but no earlier than 700 flight cycles after the embodiment of Airbus Service Bulletin A330-29-3101 or A340-29-4078.
(2) Within 100 flight cycles or 28 days after the effective date of this AD, whichever occurs first.
(ii) Within 900 flight hours after accomplishment of paragraph (g)(2)(i) of this AD, do the inspection program (detailed inspection of the lock wire for presence and integrity, a detailed inspection for traces of seepage or black deposits, and an inspection for proper torque) and install a new lock wire on the green high pressure manifold; and do an inspection (detailed inspection for traces of seepage or black deposits, and detailed inspection to determine alignment of the check valve and manifold) on the yellow and blue high pressure manifolds, and do all applicable corrective actions; in accordance with the instructions of paragraph 4.1.2 of Airbus AOT A330-29A3111, Revision 1, dated October 8, 2009 (for Model A330-200 and −300 series airplanes); or AOT A340-29A4086, Revision 1, dated October 8, 2009 (for Model A340-200 and −300 series airplanes). Do all applicable corrective actions before further flight.
(iii) Within 900 flight hours after accomplishment of paragraph (g)(2)(ii) of this AD, and thereafter at intervals not to exceed 900 flight hours, do the inspection program (detailed inspection for traces of seepage or black deposits, and detailed inspection to determine alignment of the check valve and manifold) on the green, yellow, and blue high pressure manifolds, and do all applicable corrective actions, in accordance with the instructions of paragraph 4.1.3 of Airbus AOT A330-29A3111, Revision 1, dated October 8, 2009 (for Model A330-200 and −300 series airplanes); or AOT A340-29A4086, Revision 1, dated October 8, 2009 (for Model A340-200 and −300 series airplanes). Do all applicable corrective actions before further flight.
(iv) Actions accomplished before the effective date of this AD, according to Airbus AOT A330-29A3111, dated September 2, 2009 (for Model A330-200 and −300 series airplanes); or AOT A340-29A4086, dated September 2, 2009 (for Model A340-200 and −300 series airplanes); are considered acceptable for compliance with the corresponding actions specified in paragraph (g)(2)(i) of this AD.
(3) Within 10 days after accomplishment of the inspections specified in paragraphs (g)(1) and (g)(2) of this AD, or within 10 days after the effective date of this AD, whichever occurs later, report all inspection results to Airbus in accordance with Airbus AOT A330-29A3111, Revision 1, dated October 8, 2009 (for Model A330-200 and -300 series airplanes); or AOT A340-29A4086, Revision 1, dated October 8, 2009 (for Model A340-200 and -300 series airplanes).
Note 1: This AD differs from the MCAI and/or service information as follows: No differences.