Airworthiness Directive · Amendment 39-16076 · Boeing Model 767 Airplanes
Boeing Model 767 Airplanes
This AD applies to all Boeing Model 767-200, -300, -300F, and -400ER series airplanes, certificated in any category.
We are adopting a new airworthiness directive (AD) for all Boeing Model 767 airplanes. This AD requires repetitive replacement of the internal electrical feed-through connectors of the boost pumps of the main fuel tank. This AD results from a report of cracking in the epoxy potting compound on the internal feed-through connector of the fuel boost pump in the area of the soldered wire connector lugs. We are issuing this AD to prevent a hazardous electrical path from the dry side to the wet side of the fuel boost pump through a cracked feed- through connector, or between pins or a pin and the shell on one side of the feed-through connector, which could create an ignition source on the wet side of the fuel boost pump or cause a fire in the fuel pump enclosure and lead to subsequent explosion of the fuel tank.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
For each main tank fuel boost pump: At the latest of the times specified in paragraphs (f)(1), (f)(2), and (f)(3) of this AD, do the actions specified in paragraph (g) of this AD, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 767-28A0095 or 767-28A0096; both dated September 15, 2005; as applicable.
(1) Within 96 months since the date of the first installation of the fuel boost pump or before the accumulation of 40,000 flight hours on the fuel boost pump, whichever comes first.
(2) Within 96 months since the date of replacement of the feed-through connector, or before the accumulation of 40,000 flight hours on the fuel boost pump since the date of replacement of the feed-through connector, whichever comes first.
(3) Within 24 months after the effective date of this AD.
At the compliance time specified in paragraph (f) of this AD: Replace the feed-through connector of each fuel boost pump as described in paragraph (g)(1) or (g)(2) of this AD.
(1) Replace the fuel boost pump with a new fuel boost pump.
(2) Replace the fuel boost pump with a modified and re-identified fuel boost pump having a new feed-through connector installed.
Note 1: Replacing the feed-through connector of each fuel boost pump, as required by paragraph (g) of this AD, may be done in different fuel boost pumps at different times provided the compliance times required by paragraph (f) of this AD are met for each pump.
Note 2: Boeing Alert Service Bulletins 767-28A0095 and 767-28A0096, both dated September 15, 2005, refer to Hamilton Sundstrand Alert Service Bulletin 5006003-28-A4, dated May 9, 2005, as a source of guidance for replacing the feed-through connector and re-identifying the fuel boost pump.
Repeat the replacement required by paragraph (g) of this AD thereafter at intervals not to exceed the applicable times specified in paragraphs (h)(1) and (h)(2) of this AD:
(1) For airplanes on which the replacement specified in paragraph (g)(1) of this AD is done: Within 96 months since the date of the first installation of the fuel boost pump or before the accumulation of 40,000 flight hours on the fuel boost pump, whichever comes first.
(2) For airplanes on which the replacement specified in paragraph (g)(2) of this AD is done: Within 96 months since the date of replacement of the feed-through connector or before the accumulation of 40,000 flight hours on the fuel boost pump since the date of replacement of the feed-through connector, whichever comes first.
(i) As of the effective date of this AD, no person may install a fuel boost pump on any airplane, unless that pump has a feed-through connector that meets the requirements of paragraphs (f) and (g) of this AD.