Airworthiness Directive · Amendment 39-16003 · Fuselage
Boeing Model 747-100, -100B, -100B SUD, -200B, and -300 Series Airplanes; and Model 747SP and 747SR Series Airplanes
This AD applies to Boeing Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-300, 747SP, and 747SR series airplanes; certificated in any category; identified in Boeing Service Bulletin 747-53A2349, Revision 3, dated October 2, 2008.
The FAA is superseding an existing airworthiness directive (AD), which applies to certain Boeing Model 747 series airplanes. That AD currently requires repetitive inspections to detect cracks in various areas of the fuselage internal structure, and related investigative/corrective actions if necessary. This new AD requires additional repetitive inspections for cracking of certain fuselage structure, and related investigative/corrective actions if necessary. This AD results from fatigue tests and analysis by Boeing that identified areas of the fuselage where fatigue cracks can occur. We are issuing this AD to prevent the loss of the structural integrity of the fuselage, which could result in rapid depressurization of the airplane.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
Prior to the accumulation of 22,000 total flight cycles, or within 1,000 flight cycles after June 11, 1993 (the effective date of AD 93-08-12, amendment 39-8559, which was superseded by AD 2002-10-10), whichever occurs later, unless accomplished previously within the last 2,000 flight cycles; and thereafter at intervals not to exceed 3,000 flight cycles: Perform an internal detailed inspection to detect cracks in the areas of the fuselage internal structure specified in paragraphs (g)(1) through (g)(6) of this AD; in accordance with Boeing Service Bulletin 747-53-2349, dated June 27, 1991; Boeing Alert Service Bulletin 747-53A2349, Revision 1, dated October 12, 2000; Boeing Service Bulletin 747-53A2349, Revision 2, dated April 3, 2003; or Boeing Alert Service Bulletin 747-53A2349, Revision 3, dated October 2, 2008. After the effective date of this AD, only Revision 3 of Boeing Alert Service Bulletin 747-53A2349 may be used. Continue doing the inspections until the inspections required by paragraph (j) of this AD are done.
(1) Section 42 upper lobe frames.
(2) Section 46 lower lobe frames.
(3) Section 42 lower lobe frames.
(4) Main entry door cutouts.
(5) Section 41 body station 260, 340, and 400 bulkheads.
(6) Main entry doors.
Note 1: For the purposes of this AD, a detailed inspection is: “An intensive examination of a specific item, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirror, magnifying lenses, etc., may be necessary. Surface cleaning and elaborate procedures may be required.”
(h) Prior to the accumulation of 25,000 total flight cycles, or within 1,000 flight cycles after June 11, 1993, whichever is later, unless already done within the last 2,000 flight cycles; and thereafter at intervals not to exceed 3,000 flight cycles: Do an internal detailed inspection to detect cracks in the Section 46 upper lobe frames, in accordance with Boeing Service Bulletin 747-53-2349, dated June 27, 1991; Boeing Alert Service Bulletin 747-53A2349, Revision 1, dated October 12, 2000; Boeing Service Bulletin 747-53A2349, Revision 2, dated April 3, 2003; or Boeing Alert Service Bulletin 747-53A2349, Revision 3, dated October 2, 2008. After the effective date of this AD, only Revision 3 of Boeing Alert Service Bulletin 747-53A2349 may be used.
(i) Before further flight, repair any cracks detected during the inspections done per paragraph (g) or (h) of this AD by doing the actions specified in paragraph (i)(1) or (i)(2) of this AD, as applicable.
(1) Repair in accordance with a method approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA; or using a method approved in accordance with paragraph (p) of this AD.
(2) Repair in accordance with Boeing Service Bulletin 747-53A2349, Revision 2, dated April 3, 2003; or Boeing Alert Service Bulletin 747-53A2349, Revision 3, dated October 2, 2008. After the effective date of this AD, only Revision 3 of Boeing Alert Service Bulletin 747-53A2349 may be used. Where either revision of the service bulletin specifies to contact Boeing for repair instructions, repair in accordance with a method approved by the Manager, Seattle ACO; or use a method approved in accordance with paragraph (p) of this AD.
Do an internal detailed inspection to detect cracking in the areas of the fuselage internal structure specified in paragraphs (j)(1), (j)(2), and (j)(3) of this AD, and internal and external detailed inspections of the areas specified in paragraphs (j)(4), (j)(5), (j)(6), and (j)(7) of this AD. Do the inspections in accordance with Boeing Service Bulletin 747-53A2349, Revision 2, dated April 3, 2003; or Boeing Alert Service Bulletin 747-53A2349, Revision 3, dated October 2, 2008. After the effective date of this AD, only Revision 3 of Boeing Alert Service Bulletin 747-53A2349 may be used. Do the inspections at the applicable time specified in paragraph (k) of this AD. Accomplishment of these inspections terminates the requirements of paragraph (g) of this AD.
(1) Section 42 upper lobe frames.
(2) Section 46 lower lobe frames.
(3) Section 42 lower lobe frames.
(4) Main entry door cutouts.
(5) Nose wheel well bulkheads, sidewall panels, and station (STA) 360 and 380 floor beams. These areas include Section 41 body station 260, 340, and 400 bulkheads.
(6) Main entry doors.
(7) Main electronics bay access door cutout.
(k) Do the inspections required by paragraph (j) of this AD at the applicable time specified in paragraph (k)(1), (k)(2), or (k)(3) of this AD. Repeat the inspections thereafter at intervals not to exceed 3,000 flight cycles.
(1) For airplanes on which the inspections required by paragraphs (g)(1), (g)(2), (g)(3), (g)(4), and (g)(6) of this AD have been done before November 16, 2005 (the effective date of AD 2005-20-30), but the inspections required by paragraphs (j)(5) and (j)(7) of this AD have not been done: Within 3,000 flight cycles since accomplishment of the most recent inspection required by paragraphs (g)(1), (g)(2), (g)(3), (g)(4), and (g)(6) of this AD, except that the inspections specified in paragraphs (j)(5) and (j)(7) of this AD may be done within 3,000 flight cycles since accomplishment of the most recent inspection required by paragraphs (g)(1), (g)(2), (g)(3), (g)(4), and (g)(6) of this AD, or within 1,000 flight cycles after November 16, 2005, whichever is later.
(2) For airplanes on which the inspections required by paragraphs (j)(5) and (j)(7) have been done before November 16, 2005: Within 3,000 flight cycles since accomplishment of the most recent inspection required by paragraphs (j)(5) and (j)(7) of this AD, or within 1,000 flight cycles after November 16, 2005, whichever is later.
(3) For airplanes on which the inspections required by paragraph (g) of this AD have not been done before November 16, 2005: Prior to the accumulation of 22,000 total flight cycles, or within 1,000 flight cycles after November 16, 2005, whichever is later.
Before further flight, repair any cracking found during any inspection required by paragraph (j) of this AD in accordance with Boeing Service Bulletin 747-53A2349, Revision 2, dated April 3, 2003; or Boeing Alert Service Bulletin 747-53A2349, Revision 3, dated October 2, 2008. After the effective date of this AD, only Revision 3 of Boeing Alert Service Bulletin 747-53A2349 may be used. Where any revision of the service bulletin specifies to contact Boeing for repair instructions, repair in accordance with a method approved by the Manager, Seattle ACO; or use a method approved in accordance with paragraph (p) of this AD.
Do initial and repetitive detailed inspections for cracking in the areas specified in Table 1 of this AD using applicable internal and external detailed inspection methods; and repair all cracks, by doing all the applicable actions in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2349, Revision 3, dated October 2, 2008, except as required by paragraph (n) of this AD. Do the initial and repetitive inspections at the times specified in paragraph 1.E., “Compliance,” of the service bulletin, except as required by paragraph (o) of this AD. Repair all cracks before further flight after detection.
| Inspect the addition portion of area 1 and area 6 as specified in Boeing Alert Service Bulletin 747-53A2349, Revision 3, dated October 2, 2008 (“the service bulletin”)— | For airplanes identified as these groups in the service bulletin— |
|---|---|
| In Area 1: Fuselage frames at body stations 260-520 in areas where the upper deck floor beams are attached (Figure 11 of the Accomplishments Instructions of the service bulletin) | 1 through 7 inclusive. |
| In Area 6: Fuselage frames at body stations 400-500 in areas above the Main Entry Door 1 cutouts, from the upper chord of the upper deck floor beams to Stringer 8 (Figure 12 of the Accomplishment Instructions of the service bulletin) | 6 and 7. |
If any crack is found during any inspection required by paragraph (m) of this AD, and Boeing Alert Service Bulletin 747-53A2349, Revision 3, dated October 2, 2008, specifies to contact Boeing for appropriate action: Before further flight, repair the crack using a method approved in accordance with the procedures specified in paragraph (p) of this AD.
(o) Where Boeing Alert Service Bulletin 747-53A2349, Revision 3, dated October 2, 2008, specifies a compliance time after the date on Boeing Alert Service Bulletin 747-53A2349, Revision 3, dated October 2, 2008, this AD requires compliance within the specified compliance time after the effective date of this AD.