Airworthiness Directive · Amendment 39-15589 · Lockheed Model 1329 Series Airplanes
Lockheed Model 1329 Series Airplanes
This AD applies to the following airplanes, certificated in any category.
(1) Lockheed Model 1329-23A, 1329-23D, and 1329-23E series airplanes; serial numbers 5001 through 5162 inclusive.
(2) Lockheed Model 1329-25 series airplanes, serial numbers 5201 through 5240 inclusive.
We are adopting a new airworthiness directive (AD) for certain Lockheed Model 1329 series airplanes. This AD requires determining the part number on the steering cylinder assembly for the nose landing gear (NLG), determining the total flight cycles accumulated on the NLG steering cylinder assembly, repetitively replacing the assembly, inspecting for missing tow turning limit markings, and performing corrective actions if necessary. This AD results from reports of numerous failures of the NLG steering cylinder. We are issuing this AD to prevent the loss of hydraulic pressure and steering control.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
The term “service bulletin,” as used in this AD, means the Accomplishment Instructions of the applicable service bulletin identified in Table 1 of this AD.
| Lockheed Service Bulletin | Revision | Date | Affected airplanes |
|---|---|---|---|
| 329-300 | D | October 4, 2007 | 1329-23A, 1329-23D, 1329-23E. |
| 329II-32-8 | C | October 4, 2007 | 1329-25. |
Within 30 days after the effective date of this AD, inspect to determine the part number (P/N) on the steering cylinder assembly for the nose landing gear (NLG). A review of airplane maintenance records is acceptable in lieu of this inspection if the part number can be conclusively determined from that review. Replace any cylinder assembly having P/N JL1955-1 with a new assembly before further flight in accordance with the applicable service bulletin.
Within 30 days after the effective date of this AD: Review the airplane records to determine the total flight cycles accumulated on the NLG steering cylinder assembly, in accordance with the applicable service bulletin. Before any steering cylinder assembly component reaches its life limit, as specified in Table 1 of the Accomplishment Instructions of the applicable service bulletin, or within 30 days after the effective date of this AD, whichever occurs later: Replace the cylinder assembly with a new assembly in accordance with the applicable service bulletin. If the steering cylinder assembly's age cannot be positively determined from the records review, replace it within 30 days after the effective date of this AD, in accordance with the applicable service bulletin. Thereafter, replace the cylinder assembly at intervals not to exceed the life limits as specified in the applicable service bulletin.
(i) Within 30 days after the effective date of this AD: Perform a general visual inspection above the NLG doors to detect missing tow turning limit markings, in accordance with the applicable service bulletin. If any markings are absent, restore/apply markings before further flight in accordance with the applicable service bulletin.
Note 1: For the purposes of this AD, a general visual inspection is: “A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure, or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to ensure visual access to all surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight, or droplight and may require removal or opening of access panels or doors. Stands, ladders, or platforms may be required to gain proximity to the area being checked.”
Accomplishment of the actions specified in Lockheed Service Bulletin 329-300, Revision C, dated September 5, 2006, or 329II-32-8, Revision B, dated September 5, 2006, as applicable, before the effective date of this AD, is acceptable for compliance with the corresponding requirements of this AD.
As of the effective date of this AD, do not install on any airplane a NLG steering cylinder assembly that has P/N JL1955-1.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Aircraft