Airworthiness Directive · Amendment 39-15575 · Boeing Model 737-100, -200, -200C, -300, -400, and -500 Series Airplanes
Boeing Model 737-100, -200, -200C, -300, -400, and -500 Series Airplanes
Superseded. A later AD replaced this one: AD 2008-13-12 R1. Comply with the one in force.
This AD applies to Boeing Model 737-100, -200, -200C, -300, -400, and -500 series airplanes, certificated in any category; as identified in Boeing Alert Service Bulletin 737-53A1261, dated January 19, 2006.
We are adopting a new airworthiness directive (AD) for certain Boeing Model 737-100, -200, -200C, -300, -400, and -500 series airplanes. This AD requires various repetitive inspections for cracking of the upper frame to side frame splice of the fuselage, and other specified and corrective actions if necessary. This AD also provides for an optional preventive modification, which terminates the repetitive inspections. This AD results from a report that the upper frame of the fuselage was severed between stringers S-13L and S-14L at station 747, and the adjacent frame at station 767 had a 1.3-inch-long crack at the same stringer location. We are issuing this AD to detect and correct fatigue cracking of the upper frame to side frame splice of the fuselage, which could result in reduced structural integrity of the frame and adjacent lap joint. This reduced structural integrity can increase loading in the fuselage skin, which will accelerate skin crack growth and result in decompression of the airplane.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
At the applicable compliance time listed in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 737-53A1261, including Appendices A through X inclusive, dated January 19, 2006; except as provided by paragraph (g) of this AD: Do the applicable inspections for cracking of the upper frame to side frame splice of the fuselage by doing all of the actions, as specified in the Accomplishment Instructions of the service bulletin; except as provided by paragraphs (h) and (i) of this AD. Do all applicable specified and corrective actions before further flight in accordance with the service bulletin. Repeat the applicable inspections thereafter at intervals not to exceed 6,000 flight cycles until the terminating action in paragraph (j) of this AD has been accomplished.
(g) Where Boeing Alert Service Bulletin 737-53A1261, including Appendices A through X inclusive, dated January 19, 2006, specifies a compliance time relative to the date on the service bulletin, this AD requires compliance within the specified compliance time after the effective date of this AD.
(h) If any crack is found during any inspection required by this AD, and Boeing Alert Service Bulletin 737-53A1261, including Appendices A through X inclusive, dated January 19, 2006, specifies to contact Boeing for appropriate action: Before further flight, repair the crack in accordance with the procedures specified in paragraph (k) of this AD.
(i) For airplanes on which a repair has been previously accomplished: If, during accomplishment of the corrective actions required by paragraph (f) of this AD, it is found that the repair was not done per the Boeing 737-100/200 Structural Repair Manual (SRM) 53-10-4, Figure 1, or the Boeing 737-300/400/500 SRM 53-00-07, Figure 201, Repair 1, as applicable; before further flight, repair in accordance with the procedures specified in paragraph (k) of this AD.
Accomplishing the actions specified in paragraph (j)(1), (j)(2), or (j)(3) of this AD, as applicable, terminates the repetitive inspections required by paragraph (f) of this AD for the repaired or modified frames only.
(1) Accomplishment of the repair specified in Part 3, or the preventive modification specified in Part 4, of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1261, including Appendices A through X inclusive, dated January 19, 2006.
(2) Accomplishment of the repair or the preventive modification specified in Boeing Message M-7200-02-01294, dated August 20, 2002.