Airworthiness Directive · Amendment 39-15464 · Boeing Model 757 Airplanes
Boeing Model 757 Airplanes
This AD applies to all Boeing Model 757-200, -200PF, -200CB, and -300 series airplanes, certificated in any category.
We are adopting a new airworthiness directive (AD) for all Boeing Model 757 airplanes. This AD requires repetitive inspections of the anchor tab of the bulkhead seal assemblies of the wing thermal anti-ice (TAI) system for cracks at certain outboard stations of the left and right wings, and corrective action if necessary. This AD also provides optional terminating action for the repetitive inspections. This AD results from reports of cracks found at the anchor tab of the bulkhead seal assemblies of the wing TAI system. In one incident, the anchor tab and bulkhead seal assembly had separated because of the cracks. We are issuing this AD to prevent failure of the anchor tab of the bulkhead seal assembly, which in icing conditions could result in insufficient airflow to the wing TAI system, subsequent ice on the wings, and consequent reduced controllability of the airplane.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
At the applicable times specified in paragraph 1.E., “Compliance,” of Boeing Special Attention Service Bulletin 757-30-0021 or 757-30-0022, both Revision 1, both dated June 13, 2007, as applicable; except where the service bulletins specify starting the compliance time “ * * * from the date on this service bulletin,” this AD requires starting the compliance time from the effective date of this AD: Perform detailed inspections for cracks of the anchor tab of the bulkhead seal assemblies of the wing TAI system at certain outboard stations of the left and right wings by doing all the actions, including all applicable corrective actions, in accordance with the Accomplishment Instructions of the applicable service bulletin. Do all applicable corrective actions before further flight.
Installing a new duct anchor support bracket adjacent to the bulkhead seal assemblies in accordance with Part 2 of the Accomplishment Instructions of Boeing Special Attention Service Bulletin 757-30-0021 or 757-30-0022, both Revision 1, both dated June 13, 2007, as applicable, ends the repetitive inspections required by paragraph (f) of this AD.
Actions accomplished before the effective date of this AD in accordance with Boeing Special Attention Service Bulletins 757-30-0021 and 757-30-0022, both dated August 15, 2006, are considered acceptable for compliance with the corresponding actions specified in this AD.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Aircraft