Airworthiness Directive · Amendment 39-15052 · Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model EMB-145LR, -145XR, and -145MP Airplanes; and Model EMB-135BJ and -135LR Airplanes
Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model EMB-145LR, -145XR, and -145MP Airplanes; and Model EMB-135BJ and -135LR Airplanes
This AD applies to the airplanes identified in Table 1 of this AD, certificated in any category.
| EMBRAER model— | As identified in— |
|---|---|
| EMB-145LR, -145XR, -145MP, and -135LR airplanes | EMBRAER Service Bulletin 145-28-0028, dated November 7, 2005. |
| EMB-135BJ airplanes | EMBRAER Service Bulletin 145LEG-28-0030, dated April 19, 2006. |
The FAA is adopting a new airworthiness directive (AD) for certain EMBRAER Model EMB-145LR, -145XR, and -145MP airplanes; and Model EMB-135BJ and -135LR airplanes. This AD requires replacing the electrical bonding clamps inside the fuel tanks and adjacent areas. This AD results from a report of the failure of a fitting clamp of an electrical bonding cable for the fuel tubing. We are issuing this AD to prevent loss of bonding protection in the interior of the fuel tanks or adjacent areas, and a consequent potential source of ignition in a fuel tank and possible fire or explosion.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
At the time specified in paragraph (f)(1) or (f)(2) of this AD, as applicable: Replace the electrical bonding clamps having part numbers AN735D6 and AN735D4 inside the forward fuel tank or the ventral, wing stub, and wing fuel tanks, and adjacent areas, as applicable; by accomplishing all actions specified in the Accomplishment Instructions of the applicable service bulletin identified in Table 2 of this AD.
| For EMBRAER model— | Use— |
|---|---|
| EMB-145LR, -145XR, -145MP, and -135LR airplanes | EMBRAER Service Bulletin 145-28-0028, dated November 7, 2005 |
| EMB-135BJ airplanes | EMBRAER Service Bulletin 145LEG-28-0030, dated April 19, 2006. |
(1) For Model EMB-145LR, -145XR, and -145MP airplanes; and Model EMB-135LR airplanes: Within 5,000 flight hours after the effective date of this AD.
(2) For Model EMB-135BJ airplanes: Within 4,000 flight hours or 48 calendar months after the effective date of this AD, whichever occurs first.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.