Airworthiness Directive · Amendment 39-14953 · Fokker Model F.28 Mark 0070 and 0100 Airplanes
Fokker Model F.28 Mark 0070 and 0100 Airplanes
This AD applies to all Fokker Model F.28 Mark 0070 and 0100 airplanes, certificated in any category.
The FAA is adopting a new airworthiness directive (AD) for all Fokker Model F.28 Mark 0070 and 0100 airplanes. This AD requires a one- time inspection of the fuel lines located in the left and right main landing gear (MLG) bays to determine the clearance between the fuel and hydraulic lines. If necessary, this AD also requires an inspection of fuel lines for chafing, the replacement of a chafed fuel line with a new fuel line, and the repositioning of existing clamps and installation of additional clamps between the fuel and hydraulic lines. This AD results from a fuel leak found in the left MLG bay. We are issuing this AD to detect and correct inadequate clearance between fuel and hydraulic lines in the MLG bay, which could lead to chafing of a fuel line and fuel leakage. A fuel leak near hot brakes could result in a fire in the MLG bay.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
Within 6 months after the effective date of this AD, do a general visual inspection of the fuel lines located in the left and right MLG bays to determine the clearance between the fuel and hydraulic lines, in accordance with Part 1 of the Accomplishment Instructions of Fokker Service Bulletin SBF100-28-041, dated July 20, 2005. If the clearance of a fuel line is 3 mm (millimeters) or more, no further action is required by this AD for that fuel line only. If the clearance of a fuel line is less than 3 mm, before further flight, do a general visual inspection of the fuel line for chafing in accordance with Part 1 of the Accomplishment Instructions of the service bulletin.
Note 1: For the purposes of this AD, a general visual inspection is: “A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure, or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to ensure visual access to all surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight, or droplight and may require removal or opening of access panels or doors. Stands, ladders, or platforms may be required to gain proximity to the area being checked.”
If the fuel line is found chafed during the inspection for chafing specified in paragraph (f) of this AD, before further flight after that inspection, do the actions in paragraphs (g)(1) and (g)(2) of this AD. If the fuel line is not found chafed, within 6 months after the inspection for chafing, do the actions in paragraph (g)(2) of this AD.
(1) Replace the chafed fuel line with a new fuel line in accordance with Part 1 of the Accomplishment Instructions of Fokker Service Bulletin SBF100-28-041, dated July 20, 2005.
(2) Reposition the existing clamps and install additional clamps to obtain a minimum clearance of 3 mm between the fuel and hydraulic lines, as applicable, in accordance with Part 2 of the Accomplishment Instructions of Fokker Service Bulletin SBF100-28-041, dated July 20, 2005.