Airworthiness Directive · Amendment 39-14799 · Airbus Model A300 B4-600, B4-600R, and F4-600R Series Airplanes, and Model A300 C4-605R Variant F Airplanes (Collectively Called A300-600 Series Airplanes)
Airbus Model A300 B4-600, B4-600R, and F4-600R Series Airplanes, and Model A300 C4-605R Variant F Airplanes (Collectively Called A300-600 Series Airplanes)
This AD applies to Airbus Model A300 B4-601, B4-603, B4-620, B4-622, B4-605R, B4-622R, F4-605R, F4-622R, and C4-605R Variant F airplanes; certificated in any category; equipped with a Hamilton Sundstrand Ram Air Turbine (RAT).
The FAA is superseding an existing airworthiness directive (AD), which applies to certain Airbus Model A300-600 series airplanes. That AD currently requires an inspection for evidence of chafing between the hydraulic flexible hose and the ram air turbine (RAT) hub, and related investigative and corrective actions if necessary. This new AD extends the applicability to include all Model A300-600 series airplanes that are equipped with a certain RAT. This AD results from reports of holes in the RAT hub cover. We are issuing this AD to prevent a hole in the RAT hub cover. A hole in the RAT hub cover could allow water to enter the RAT governing mechanism, freeze during flight, and jam the governing mechanism. In addition, the metal particles that result from chafing between the hydraulic flexible hose and the RAT could mix with the lubricant grease and degrade the governing mechanism. In an emergency, a jammed or degraded RAT could result in its failure to deploy, loss of hydraulic pressure or electrical power to the airplane, and consequent reduced controllability of the airplane.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
At the applicable time specified in paragraph (f)(1) or (f)(2) of this AD: Do a one-time detailed inspection for evidence of chafing between the hydraulic flexible hose and the RAT hub, and any applicable related investigative and corrective actions, by accomplishing all of the applicable actions specified in the Accomplishment Instructions of Airbus Service Bulletin A300-29-6054, Revision 01, excluding Appendix 01, dated November 4, 2004; or Revision 02, excluding Appendix 01, dated January 12, 2006. After the effective date of this AD, only Revision 02 of the service bulletin may be used. Any applicable corrective actions must be accomplished before further flight. Where the service bulletins specify to submit certain information to the manufacturer, and to submit damaged RATs to the vendor or a repair station, this AD does not include those requirements.
(1) For airplanes having serial numbers (S/Ns) 0812, 0813, 0815 through 0818 inclusive, 0821 through 0828 inclusive, and 0836 through 0838 inclusive: Within 2,500 flight hours after August 26, 2005 (the effective date of AD 2005-15-05).
(2) For airplanes not identified in paragraph (f)(1) of this AD: Within 2,500 flight hours after the effective date of this AD.
Note 1: For the purposes of this AD, a detailed inspection is: “An intensive examination of a specific item, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirror, magnifying lenses, etc., may be necessary. Surface cleaning and elaborate procedures may be required.”
Actions accomplished before the effective date of this AD, in accordance with the Accomplishment Instructions of Airbus Service Bulletin A300-29-6054, excluding Appendix 01, dated June 8, 2004, are acceptable for compliance with the corresponding actions specified in this AD.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.