Airworthiness Directive · Amendment 39-14360 · Airbus Model A319-100 Series Airplanes, Model A320-111 Airplanes, Model A320-200 Series Airplanes, and Model A321-100 Series Airplanes
Airbus Model A319-100 Series Airplanes, Model A320-111 Airplanes, Model A320-200 Series Airplanes, and Model A321-100 Series Airplanes
Superseded. A later AD replaced this one: AD 2012-09-12. Comply with the one in force.
This AD applies to Airbus Model A319-111, -112, -113, -114, -115, -131, -132, and -133 airplanes; Model A320-111, -211, -212, -214, -231, -232, and -233 airplanes; and Model A321-111, -112, and -131 airplanes; certificated in any category; which are equipped with any additional center tank (ACT).
The FAA is adopting a new airworthiness directive (AD) for certain Airbus Model A319-100 series airplanes, Model A320-111 airplanes, Model A320-200 series airplanes, and Model A321-100 series airplanes equipped with any additional center tank (ACT). This AD requires identifying the part number of the ACT and, for certain ACTs, replacing the outer ACT manhole cover and seal. This AD results from reports of an ACT fuel transfer failure due to air leakage around the seal of the outer manhole covers of the ACTs. We are issuing this AD to prevent this leakage, which could result in fuel or fuel vapor leaking into the cargo compartment, and consequent increased risk of a fire in the cargo compartment.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
Within 30 days (for Model A319-111, -112, -113, -114, -115, -131, -132, and -133 airplanes) or 12 months (for Model A320-111, -211, -212, -214, -231, -232, and -233 airplanes; and Model A321-111, -112, and -131 airplanes) after the effective date of this AD: Determine whether the part number (P/N) of each ACT installed on the airplane is included in Table 1 of this AD. If no ACT installed on the airplane has a P/N included in Table 1 of this AD, no further work is required by this paragraph.
| D2827091100000 |
| D2827091100200 |
| D2827091100600 |
| D2827091300000 |
| D2827091300200 |
| D2827091300400 |
| D2827105100000 |
| D2827105100200 |
| D2827105100400 |
| D2827105200000 |
| D2827105200200 |
| D2827105200400 |
| D2827105300000 |
| D2827105300200 |
| D2827105300400 |
| D2827105400000 |
| D2827105400200 |
| D2827105400400 |
| D2827105400600 |
| D2827105400800 |
| D2827105500000 |
| D2827105500200 |
| D2827105500400 |
| D2827105600000 |
| D2827105600200 |
| D2827105600400 |
| D2827107500000 |
| D2827107500200 |
Within 30 days (for Model A319-111, -112, -113, -114, -115, -131, -132, and -133 airplanes) or 12 months (for Model A320-111, -211, -212, -214, -231, -232, and -233 airplanes; and Model A321-111, -112, and -131 airplanes) after the effective date of this AD: For each ACT P/N listed in Table 1 of this AD: Before further flight, replace the outer ACT manhole cover with a reinforced manhole cover and replace the outer manhole cover seal with a new seal, in accordance with the Accomplishment Instructions of Airbus Service Bulletin A320-28-1105, Revision 02, dated March 11, 2005. Replacements are also acceptable if done before the effective date of this AD in accordance with Airbus Service Bulletin A320-28-1105, Revision 01, dated March 18, 2003; and Airbus Service Bulletin A320-28-1105, dated October 22, 2002.
As of the effective date of this AD, no person may install an ACT having any P/N listed in Table 1 of this AD, unless the actions required by paragraph (g) of this AD have been done for that ACT.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Aircraft