Airworthiness Directive · Amendment 39-14029 · General Electric Company CF6-45A, CF6-50A, CF6-50C, and CF6-50E Series Turbofan Engines
General Electric Company CF6-45A, CF6-50A, CF6-50C, and CF6-50E Series Turbofan Engines
This AD applies to General Electric Company (GE) CF6-45A, CF6-50A, CF6-50C, and CF6-50E series turbofan engines that have not incorporated GE Service Bulletin (SB) No. CF6-50 S/B 72-1239, Revision 1, dated September 24, 2003, or that have not incorporated paragraph 3.B. of GE SB No. CF6-50 S/B 72-1239, original issue, dated May 29, 2003. These engines are installed on, but not limited to, Boeing DC10 and 747 series airplanes, and Airbus Industrie A300 series airplanes.
The FAA is adopting a new airworthiness directive (AD) for General Electric Company (GE) CF6-45A, CF6-50A, CF6-50C, and CF6-50E series turbofan engines that have not incorporated GE Service Bulletin (SB) No. CF6-50 S/B 72-1239, Revision 1, dated September 24, 2003, or that have not incorporated paragraph 3.B. of GE SB No. CF6-50 S/B 72- 1239, original issue, dated May 29, 2003. This AD requires inspecting the stage 1 low pressure turbine (LPT) blades for damage and replacement of the LPT module if necessary. This AD results from a report of a stud that separated from a turbine mid frame (TMF) strut and from an updated analysis of strut stud failures. We are issuing this AD to prevent uncontained failure of the engine and possible damage to the airplane caused by failure of TMF strut studs.
You are responsible for having the actions required by this AD performed within the compliance times specified unless the actions have already been done.
Borescope-inspect the low pressure turbine (LPT) stage 1 blades within 3,000 cycles-since-new (CSN), or 3,000 cycles-since-replacement of the TMF strut studs, or 150 cycles-in-service (CIS) after the effective date of this AD, which ever occurs later. Use paragraph 3.A.(2) of the Accomplishment Instructions of GE Alert Service Bulletin (ASB) No. CF6-50 S/B 72-A1251, dated September 24, 2003, to do the inspection.
(g) Replace any LPT module that has stage 1 LPT blade damage exceeding aircraft maintenance manual (AMM) limits.
Borescope-inspect the LPT stage 1 blades within intervals of 500 cycles-since-last-inspection or within 500 cycles-since-last shop visit, or within 150 CIS after the effective date of this AD, whichever occurs later. Use paragraph 3.A.(3) of the Accomplishment Instructions of GE ASB No. CF6-50 S/B 72-A1251, dated September 24, 2003, to do the inspections.
(i) Replace any LPT module that has stage 1 LPT blade damage exceeding AMM limits.