Airworthiness Directive · Amendment 39-14013 · McDonnell Douglas Model DC-8 Airplanes
McDonnell Douglas Model DC-8 Airplanes
This AD applies to all McDonnell Douglas Model DC-8 airplanes, certificated in any category.
The FAA is adopting a new airworthiness directive (AD) for all McDonnell Douglas Model DC-8 airplanes. This AD requires an inspection of the pushrod assemblies for the left and right elevator control tabs to determine if the pushrod assemblies are made of aluminum or steel, replacing any assembly made of aluminum with an assembly made of steel or modifying existing steel assemblies, and other specified actions. This AD also requires an inspection of the crank assemblies for the inboard and outboard geared tabs of the elevator to determine if the crank assemblies are made of aluminum or steel, replacing any assembly made of aluminum with an assembly made of steel, and other specified actions. This AD is prompted by an accident involving a DC-8 airplane. The probable cause of the accident was a loss of pitch control resulting from the disconnection of the pushrod for the right elevator control tab. The pushrod dropped down and jammed in front of the control tab crank, causing a large deflection of the control tab. We are issuing this AD to minimize the possibility of a control tab offset. A control tab offset could cause elevator deflection, an elevator airplane-nose-up condition, and reduced controllability of the airplane. This AD is also prompted by a report that the elevator on a McDonnell Douglas Model DC-8 airplane did not respond to command inputs from the flightcrew. We are also issuing this AD to minimize the possibility of crank assembly failure when the assembly is exposed to abnormal load conditions. Failure of a crank assembly could result in a jammed elevator and consequent reduced controllability of the airplane.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
Within 24 months after the effective date of this AD: Do an inspection of the pushrod assemblies located in the left and right elevator control tabs to determine whether the assemblies are made of aluminum or steel. Replace any pushrod assembly made of aluminum with a new, improved pushrod assembly made of steel, or modify any existing steel pushrod assembly by replacing the aft end assembly with a new, improved aft end assembly, as applicable. Do the inspection, replacement or modification, and all other applicable specified actions by accomplishing all of the actions in the Accomplishment Instructions of Boeing Alert Service Bulletin DC8-27A281, dated June 2, 2004. The replacement or modification and other applicable specified actions must be done before further flight.
Within 24 months after the effective date of this AD: Do an inspection of the inboard and outboard geared tab crank assemblies, located in the left and right elevators, to determine whether the assemblies are made of aluminum or steel. Replace any crank assembly made of aluminum with a new, improved crank assembly made of steel. Do the inspection, replacement, and other applicable specified actions by accomplishing all of the actions in the Accomplishment Instructions of Boeing Alert Service Bulletin DC8-27A280, dated June 2, 2004. The replacement and other applicable specified actions must be done before further flight.