Airworthiness Directive · Amendment 39-11998 · Boeing Model 747-100, 747-200, 747-300, 747SP, and 747SR Series Airplanes Powered by Pratt & Whitney JT9D-3 and JT9D-7 Series Engines
Boeing Model 747-100, 747-200, 747-300, 747SP, and 747SR Series Airplanes Powered by Pratt & Whitney JT9D-3 and JT9D-7 Series Engines
Superseded. A later AD replaced this one: AD 2001-12-23. Comply with the one in force.
Model 747-100, 747-200, 747-300, 747SP, and 747SR series airplanes powered by Pratt & Whitney JT9D-3 or JT9D-7 series engines; listed in Boeing Alert Service Bulletin 747-54A2201, dated September 28, 2000; certificated in any category.
Note 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (e) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.
This amendment adopts a new airworthiness directive (AD) that is applicable to certain Boeing Model 747-100, 747-200, 747-300, 747SP, and 747SR series airplanes powered by Pratt & Whitney JT9D-3 or JT9D-7 series engines. This action requires inspections of the vertical chords of the aft torque bulkhead of the outboard nacelle struts, and corrective action, if necessary. This action also provides optional terminating action for the inspections. This action is necessary to detect and correct cracking of the vertical chords adjacent to the lower spar fitting, which could result in separation of the diagonal brace load path. Continued operation with a separated diagonal brace load path increases loads on the upper link, midspar fitting, and dual side links, which could result in separation of the strut and engine from the airplane. This action is intended to address the identified unsafe condition.
To detect and correct cracking of the vertical chords adjacent to the lower spar fitting, which could result in separation of the diagonal brace load path and lead to separation of the strut and engine from the airplane, accomplish the following:
(a) Except as provided by paragraph (b) of this AD, prior to the accumulation of 14,000 total flight cycles, or within 90 days after the effective date of this AD, whichever occurs later: Accomplish paragraphs (a)(1) and (a)(2) of this AD.
(1) Perform a detailed visual inspection to detect cracking of the vertical chords of the aft torque bulkhead of the outboard nacelle struts, in accordance with Part 2 of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-54A2201, dated September 28, 2000. Thereafter, repeat this inspection at intervals not to exceed 600 flight cycles until paragraph (d) of this AD is accomplished.
(2) Perform surface eddy current and ultrasonic inspections to detect cracking of the vertical chords of the aft torque bulkhead of the outboard nacelle struts, in accordance with Part 3 of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-54A2201, dated September 28, 2000. Thereafter, repeat these inspections at intervals not to exceed 1,200 flight cycles until paragraph (d) of this AD is accomplished.
(b) If Boeing Service Letter 747-54-055, dated April 24, 1998, was accomplished on the airplane during the modification of the nacelle strut in accordance with AD 95-10-16, amendment 39-9233: Accomplishment of the initial inspection in paragraph (a) of this AD may be deferred until 3,000 flight cycles after accomplishment of the service letter.
(c) If any cracking is detected during any inspection required by this AD: Prior to further flight, repair in accordance with a method approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA; or in accordance with data meeting the type certification basis of the airplane approved by a Boeing Company Designated Engineering Representative who has been authorized by the Manager, Seattle ACO, to make such findings. For a repair method to be approved by the Manager, Seattle ACO, as required by this paragraph, the approval letter must specifically reference this AD.
(d) Accomplishment of the modification specified in Part 4 of Boeing Alert Service Bulletin 747-54A2201, dated September 28, 2000, constitutes terminating action for the repetitive inspections required by paragraph (a) of this AD.