# Sign off a completed inspection

> Click Sign off on the inspection row, set Completed on to the day the work actually finished, correct the meter reading, add notes, then Sign off. A repeating inspection immediately starts counting again from those numbers.

Source: https://www.aerscheduler.com/docs/maintenance/sign-off-an-inspection
Section: Maintenance and squawks. For: Owners, Admins, Technicians.

Click **Sign off** on the inspection row, set **Completed on** to the day the work actually
finished, correct the meter reading, add your notes, then click **Sign off**. A repeating
inspection starts counting again immediately, from exactly those two numbers.

**Who can do this:** Owners, Admins, Technicians

## Sign it off

1. **Find the inspection**

   `Maintenance → Inspections` (web console), grouped by Status, is the work queue for
   the whole school, worst first. Or open the tail and use its Inspections card at
   `Aircraft → the tail → Maintenance` (web console). On the phone:
   `Maintenance → Inspections` (mobile app), which is where technicians
   usually work.

   ![Maintenance, Inspections grouped by status](https://www.aerscheduler.com/docs/maintenance-all-inspections.png)

2. **Attach files while the work is open (optional)**

   Tap **Files** on the row. Photos and PDFs sit on this open inspection (a packing slip,
   an in-progress photo). On the phone that is **Take photo**, **Choose from Photos**, or
   **Browse Files**. When you sign off and keep a compliance record, they copy onto that
   record. They do not follow the next cycle. If you sign off without a record, they come
   off this inspection and are not stored.

3. **Click Sign off on the row**

   Dispatchers do not see this button. Only admins, owners and technicians can sign work
   off.

4. **Set Completed on**

   The day the work was actually finished. It cannot be in the future.

5. **Correct the meter reading**

   On an hour-based inspection you are asked for the tach or Hobbs reading when the work
   was done. It defaults to today's meter, which is usually not the right number.

6. **Add notes and click Sign off**

   Work order number, who did it, what was found. Up to 500 characters.

   ![Sign off](https://www.aerscheduler.com/docs/sign-off-inspection-modal.png)

## Enter the meter reading from the day the work was done, not today

This is the field that matters most. It is filled in from the aircraft, so the usual answer
is to confirm the number rather than type it, and to change it when the work was done
earlier at a lower reading.

An inspection counted in hours will not sign off without it. That is deliberate: the
**next** interval counts from the number you type. Sign off a 100-hour with today's
tach when the work was actually done six hours ago and the next 100-hour comes due six
hours late. Permanently, on every cycle after that, with nothing on screen to say so.

> **Careful:** Same rule in the other direction: if the shop finished the annual on the 3rd and you sign
> it off on the 12th, put the 3rd in **Completed on**. The next annual is measured from what
> you type, not from when you typed it.

## Keeping a compliance record

> **Important:** A compliance record here is a tracking record. It does not replace the maintenance record
> entry required by 14 CFR 43.9 and 43.11. Make your logbook entry as usual.

Under the notes there is a **Keep a compliance record** switch. Turn it on and the sign-off
also writes a permanent entry: what was done, both meter readings, and who certified it.

It is already on for an inspection marked as an Airworthiness Directive, because for those
the record is the point of signing off at all. For an oil change, leave it off; nothing
about signing off has changed.

> **Careful:** A compliance record cannot be edited or deleted once signed. A correction is a new record,
> not a change to the old one.

See [Track Airworthiness Directives](https://www.aerscheduler.com/docs/maintenance/track-airworthiness-directives) for
what goes in each field and where to read the history back.

## What happens next

- The item leaves **Inspections**. That view is a work queue and only holds outstanding work.
- If the rule repeats, a fresh inspection is created straight away, counting from your completed date and completed meter reading.
- A one-off does not come back. Once it is signed off on every tail it covers, the rule disappears from Inspection rules entirely.
- An "Inspection signed off" line is written to the audit log with your name on it.

## When the aircraft comes back on the line automatically

If the aircraft was grounded automatically by an inspection coming due, its grounding reason
is the single word "Maintenance". Sign off the last outstanding item holding it and
AerScheduler returns the aircraft to service by itself. The dialog says as much before you
confirm.

Every overdue inspection on that tail has to be signed off first, not only the ones that
ground. An overdue VOR check or oil change is enough to keep the aircraft grounded.

## When it does not

> **Careful:** If somebody grounded the aircraft **by hand** and typed their own reason ("Prop strike",
> "Annual in progress"), signing inspections off will never lift it. Only the automatic
> reason "Maintenance" is ever cleared automatically, because AerScheduler will not overrule
> a human decision. An admin or a technician has to click **Return to service** on the aircraft. See
> [Ground an aircraft, and return it to service](https://www.aerscheduler.com/docs/maintenance/ground-an-aircraft).

## Notes, and the 500 character limit

Both the console and the app stop you at 500 characters, so you cannot type a note that
will not save. Notes are a working record for the shop; the method of compliance on an
Airworthiness Directive is the field an inspector reads, and it holds 2,000.

## Signing off happens once

An inspection that has already been signed off answers "That inspection has already been
signed off" rather than recording the work twice. If two people sign the same inspection
at the same moment, or a phone retries a request on a bad connection, exactly one record
is kept.

To correct a sign-off, add a new one. See
[Track Airworthiness Directives](https://www.aerscheduler.com/docs/maintenance/track-airworthiness-directives).

## Where signed-off work goes

It stays on the aircraft's record and in the audit log. It just leaves the queue.

The console's **Inspections** view can never show completed work, and the Status filter
there (Overdue, Due soon, Needs a reading or date, Not yet due) has no "Signed off" option on
purpose. The app's
Inspections board does have one, behind the filter glyph, so reach for the phone when
somebody asks you to prove a 100-hour was signed off.

> **Tip:** The **Maintenance due** report under `Reports` (web console) carries resolved items
> along with outstanding ones, with who signed them off and their notes. That is the export
> to hand somebody who wants the paperwork.

## Common questions

**Can I attach a packing slip before I sign off?**

Yes. Tap Files on the inspection row, on the phone or the desk. Those photos and PDFs copy onto the compliance record when you sign off, then come off the open inspection so they do not follow the next cycle. If you sign off without a record, they come off the inspection and are not stored.